- Knoxville, TN
- https://orcid.org/0009-0007-5708-3520
Popular repositories Loading
-
UT-Substation-Simulator
UT-Substation-Simulator PublicThis is a collaboration site of the Electric Power Research Institute (EPRI) for the Senior Design Program, advancing the substation simulator.
-
EPRI-Blockchain-Energy-Trading-Sim
EPRI-Blockchain-Energy-Trading-Sim PublicBased on the CIRED paper: AUTOMATION OF THE SUPPLIER ROLE IN THE GB POWER SYSTEM USING BLOCKCHAIN BASED SMART CONTRACTS
-
CIM-Testing
CIM-Testing PublicArtifacts e.g. WSDLs/XSDs, required for application integration using IEC standard 61968-100 designed to pass the respective interoperability tests
Something went wrong, please refresh the page to try again.
If the problem persists, check the GitHub status page or contact support.
If the problem persists, check the GitHub status page or contact support.