A custom Claude Code slash command that estimates the replacement cost to rebuild any codebase with a traditional human team — no AI, just developers, designers, PMs, and meetings.

Open Claude Code in any project, run /cost-estimate, and get a full breakdown: P10/P50/P90 ranges, a four-way cross-check (bottom-up × COCOMO II × Function Point × LOCOMO), real Claude token cost from session logs, current market rates, realistic team costs, and external anchors from Harvard (Hoffmann-Nagle-Zhou 2024) and IFPUG (Capers Jones). Prints the full report to the terminal and saves a copy plus a machine-readable cost-estimate.json to a temp directory (never the project — safer against accidental commits).

Read "How to read the report" below before quoting any number. Replacement cost to rebuild ≠ market value ≠ what it actually cost to build. Three different numbers, often orders of magnitude apart.

Example Output

Cost estimate report screenshot

What It Does

The skill acts as a senior software engineering consultant. It:

  1. Measures the codebase properly — prefers cloc / tokei / scc (fast, accurate language breakdown) and falls back to filtered find + wc. Explicitly excludes vendored deps, generated code, minified bundles, and lockfiles.
  2. Detects quality signals — test ratio, type coverage, docs, CI maturity, observability — applied as a quality multiplier on per-LOC value.
  3. Categorizes code by complexity — 15 categories with productivity ranges (low/mid/high), from simple CRUD to GPU/shader code, compiler tooling, real-time systems, and embedded.
  4. Cross-checks with COCOMO II — the industry-validated top-down model. If bottom-up and COCOMO disagree by more than 2x, investigates before reporting.
  5. Compounds overhead multipliers correctly — architecture, debugging, testing, etc. multiply sequentially (not additively), with an explicit formula.
  6. Researches current market rates — regional breakdowns (global remote, US remote, SF/NYC onsite, specialists).
  7. Accounts for real-world overhead — meetings, code reviews, Slack, context switching, sprint ceremonies, mapped to realistic coding efficiency by company stage.
  8. Estimates full team cost — not just engineering, but PM, design, QA, DevOps, tech writing, management, staffed according to company stage.
  9. Computes churn-aware Claude ROI — uses git log --numstat for actual additions/deletions, clusters commits into sessions, computes value per Claude hour and speed multiplier vs. a human team.
  10. Does sensitivity analysis — surfaces the 2-3 assumptions that move the estimate most.
  11. States limitations loudly — every report includes confidence level, assumptions, and what's not counted.

Output Includes

  • TL;DR at the top (LOC, hours, cost, calendar time, Claude ROI — in five lines)
  • Codebase metrics with excluded-LOC breakdown and a quality multiplier
  • Engineering hours as P10/P50/P90 ranges
  • COCOMO II cross-check with divergence analysis
  • Calendar time across four company types (solo → enterprise)
  • Market rate research with regional breakdown
  • Full team cost with role-by-role breakdown
  • Claude ROI: speed multiplier, cost savings, value per Claude hour, ROI multiple
  • Sensitivity analysis (which assumption drives the number)
  • Explicit assumptions and limitations
  • Machine-readable cost-estimate.json artifact

Installation

Copy the skill into your project's .claude/skills/ directory. The skill follows Anthropic's progressive-disclosure layout — a slim SKILL.md (< 500 lines) plus scripts/, references/, and assets/ that load only when the relevant step runs:

your-project/
  .claude/
    skills/
      cost-estimate/
        SKILL.md                 # orchestrator (346 lines)
        scripts/                 # executable helpers (LOC count, git signals, Claude token cost, …)
        references/              # methodology tables loaded on demand (COCOMO II, FP, LOCOMO, …)
        assets/                  # report template + JSON artifact schema

Or clone this repo and copy the skill folder:

git clone https://github.com/jbarbier/claude-code-cost-estimate.git
cp -r claude-code-cost-estimate/.claude/skills/cost-estimate your-project/.claude/skills/

To install it globally (available in all projects), place it in your home directory:

cp -r claude-code-cost-estimate/.claude/skills/cost-estimate ~/.claude/skills/

Recommended (optional)

For faster, more accurate LOC counting, install one of:

# macOS
brew install cloc tokei scc

# Debian/Ubuntu
sudo apt install cloc

# cargo (tokei)
cargo install tokei

The skill gracefully falls back to find + wc -l if none are installed.

Usage

Inside Claude Code, simply run:

/cost-estimate

Claude will analyze the current project and print the full report to your terminal. It also saves a Markdown copy and a machine-readable cost-estimate.json to a temp directory — never to the project directory itself, so you can't accidentally git add and commit a report containing rates, costs, or team numbers.

Output file locations (auto-detected):

  • Linux: /tmp/cost-estimate/<project-name>/
  • macOS: /var/folders/…/T/cost-estimate/<project-name>/ (resolved via tempfile.gettempdir())
  • Windows: %TEMP%\cost-estimate\<project-name>\

If you explicitly want the report in the project directory, say "write it here" — otherwise the default is always the temp dir.

How to read the report

The skill produces a range, not a quote. Before you quote any figure, make sure you understand these four things.

1. What the headline number means

"Replacement cost to rebuild" — what a traditional human team would spend today to recreate the codebase from scratch, assuming specs already exist.

It is NOT:

Confusion What it actually is
Market value / sale price Value is what a buyer will pay — could be 10× this or 0
What it cost to build AI-assisted builds can cost a fraction of the replacement number
Total cost of ownership Build is ~40–50% of 5-year TCO (the report gives a lifetime_cost_5y line)
A quote you can send a client Every number has ±30–50% uncertainty baked in

If a non-technical stakeholder asks "what's our codebase worth?" and you hand them this number, you've just created a misunderstanding. Point them at the replacement cost framing, the range, and the "What this does NOT include" block at the top of the report.

2. Why you see four different hour estimates

Each cross-checks the others. When they agree, confidence is high. When they disagree, the report tells you which is likely wrong and why.

Method What it's good at What it's bad at
Bottom-up (category × rate) Handles stack-specific productivity nuance Anchored on LOC — under-counts dense code, over-counts boilerplate
COCOMO II Industry-validated top-down; good for large projects 17 effort multipliers collapsed to 5 buckets in our version
Function Point backfiring User-facing feature density, language-agnostic Noisy below ~5k LOC
LOCOMO What an LLM would cost to regenerate the code today Assumes a complete spec; undercounts safety-critical domains

If the four methods agree within ±30%, the report marks confidence high. If one is an outlier, it's named. If they all disagree, the report says low confidence — reconcile first — don't publish.

3. Flags that change how you read the number

Watch for these in the report header — they change the interpretation of everything else:

  • ai_authored_flag: clear — the project was built with heavy AI assistance (>2,000 LOC/day net churn). The $X figure is the hypothetical human rebuild cost, not what was actually spent. Frame it as "here's what this would cost a human team; here's what Claude actually cost" — never as "we saved $X."
  • speed_multiplier sanity: implausible — we're claiming Claude was >20× faster than a human team. GitHub Copilot's peer-reviewed 2024 study measured 1.55×. If our number is 60×, something is wrong (usually: uncounted review time, inflated bottom-up, or missed sessions). The report disclaims the number automatically — you should too.
  • harvard_flag: too_high / too_low — our P50 diverges from the Harvard supply-side anchor (3.5× naive LOC × $0.15) by more than expected. Usually means excluded code leaked back in, or a wrong company-stage multiplier.
  • Three-way / four-way agreement: low — the cross-checks disagree. Fix this before quoting. Don't average four numbers and pretend that's rigor.

4. What the number is missing, always

Even a "high confidence" estimate excludes large real costs:

  • Discovery, user research, PMF iteration, failed experiments
  • Institutional knowledge — what the team learned while building it
  • Customer-support-driven edge cases and decisions
  • Marketing, sales, legal, compliance, hosting
  • Post-delivery maintenance (partially covered by the 5-year TCO line)

The report prints this list front and center. Don't scroll past it.

Methodology in one paragraph

LOC* is treated as a proxy (corrected by quality signals, churn, and DRYness*), not truth. Overheads compound multiplicatively, not additively. Rates come from WebSearch with versioned fallbacks. Claude-hour ROI* uses real ~/.claude/projects/*.jsonl token usage when available (ground-truth API cost) and git-churn session clustering when not. Every dollar figure is paired with P10/P50/P90*. Every strong claim is paired with an assumption the reader can override.

Glossary

Acronyms and jargon used in this README and in the generated report:

  • LOCLines of Code. Raw source-line count, excluding comments/blanks/vendored/generated.
  • KSLOCThousand Lines of Code (= LOC ÷ 1000). Input unit for COCOMO II.
  • ULOCUnique Lines of Code. Distinct lines across the codebase, used to measure DRYness.
  • DRYness — Ratio ULOC / LOC. A DRYness of 1.0 means no duplication; 0.6 means 40% of lines are copy-paste.
  • P10 / P50 / P90Percentiles. P10 = optimistic (only 10% of scenarios come in cheaper), P50 = median, P90 = pessimistic (90% come in cheaper). Standard software-estimation banding.
  • COCOMO IICOnstructive COst MOdel II (Barry Boehm, 1995). Industry-standard parametric top-down model that converts KSLOC into person-months using scale factor E and an EAF.
  • EAFEffort Adjustment Factor. COCOMO II's product of 17 effort multipliers (collapsed to 5 buckets in this skill).
  • Function Points (FP) — Size metric based on user-visible features, language-agnostic. "Backfiring" converts LOC → FP via the QSM language-specific ratio (C=148, Java=53, Python=21, etc.).
  • LOCOMOLLM cOst MOdel. Counterfactual: "what would it cost an LLM to re-generate this code today?" (tokens × published API rates + human review time). Popularised by scc.
  • SPACE framework — GitHub's 2024 Satisfaction, Performance, Activity, Communication, Efficiency study on Copilot. Produced the peer-reviewed 1.55× speed-multiplier baseline we sanity-check against.
  • ROIReturn on Investment. Here: (human rebuild cost − actual Claude cost) ÷ actual Claude cost.
  • TCOTotal Cost of Ownership. Build + 5 years of maintenance (Capers Jones data: build ≈ 40-50% of 5-year TCO).
  • IFPUGInternational Function Point Users Group. Source of the function-point industry benchmarks.
  • QSMQuantitative Software Management. Publishes the language-to-function-point conversion table backfiring relies on.
  • PMFProduct-Market Fit. The iteration that happens before a codebase even exists; excluded from replacement cost.
  • JSONLJSON Lines (one JSON object per line). Format of Claude Code's session transcripts at ~/.claude/projects/<hash>/*.jsonl.
  • Max / Pro / API — Anthropic subscription tiers. Max = $200/mo flat, Pro = $20/mo flat, API = pay-per-token.
  • Opus / Sonnet / Haiku — Claude model tiers. Each has its own per-token rate, pulled from Anthropic's published pricing.
  • AI-authored flag — Derived from net_LOC / calendar_day. Over ~2,000 LOC/day is physically impossible for a solo human, so the skill reframes the estimate as a counterfactual ("what humans would have cost") rather than elapsed spend.
  • Harvard supply-side anchor — From Hoffmann, Nagle, Zhou (SSRN 4693148, 2024). Supply-side value of OSS-like codebases averages ~3.5× a naive LOC × $0.15 calculation. Used as a reality check on our P50.
  • Replacement cost to rebuild — What it would cost a human team to recreate the codebase today given specs. Not market value, not what it actually cost to build, not TCO.

Credit

This skill is an expanded version of the original idea by Todd Saunders (@toddsaunders on Twitter/X).

Upstream

This skill is structured to conform to Anthropic's official Agent Skill best practices: SKILL.md stays under 500 lines, detailed methodology lives in references/, executable helpers live in scripts/, and output templates live in assets/. If you'd like to see it in the anthropics/skills repository, upvote or comment on the submission PR.

License

MIT

About

Claude Code skill that estimates the full development cost of any codebase

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors