Repository navigation
feat(chores): Schedule a new chore right from its dialog (#368, onto main) - #370
Merged
Merged
Conversation
* feat(chores): Schedule a new chore right from its dialog The New chore dialog has Cancel, Create and Schedule. Schedule saves the chore and steps through giving it a schedule, one person at a time: who it's for (a person or Bonus chores), then when, with the same Picker | Wizard as the board's Add and that person's own schedules below, then a one-line summary with Complete. Under the summary, an info box offers Next schedule, which saves this one and goes back to who, for someone else with their own schedule. - Each schedule is saved as it's confirmed, so Cancel drops only the one in progress; the chore and the schedules already saved stay. People already scheduled in the flow are marked and can't be picked again. - Editing a chore, or making one from the board's Add (already scheduling it), shows no Schedule button. - The picker's pieces move to SchedulePicker.jsx so the board and the flow share them: the chips with the Monthly and Custom panels and the day row, the Picker | Wizard switch, the names of timings, the person's own schedules, and Change days' quick buttons and Custom panel. - The wizard's "Step 2 of 5" counts the flow's who step. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> * feat(chores): Schedule can give several people the same schedule "Who is it for?" now takes one person or several: tap to pick (a green tint and a check), tap again to drop, then Next. Everyone picked gets the same schedule, one row each. An info line says so, and that Next schedule at the end gives someone else a different one. - The timing step and the summary name everyone picked. A person's own schedules are offered only when one person is picked. - If a save fails partway, the ones saved stay saved and the rest stay picked, to try again. - Hover tints only where there's a real pointer, so a tap on a touch screen doesn't leave a third look behind. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
adamecker
pushed a commit
to adamecker/HomeGlow
that referenced
this pull request
Nov 1, 2026
…, jherforth#370; admin jherforth#366; ha-panels jherforth#371) into test/all-combined # Conflicts: # server/migrations/registry.js # server/tests/anyDayChores.test.js
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Brings #368 to main. #368 was stacked on #367, and was merged into #367's branch (
feat/add-dialog-order) after #367 itself had been squash-merged to main, so its changes never reached main. This is that squashed commit (6305a05) applied cleanly on top of main, which now includes #365, #367 and #369.What it adds is described in #368: the chore dialog's Cancel | Create | Schedule, and the Schedule flow (who, with several people at once, then when, then check, with Complete and Next schedule).
Checks on this branch
check:i18nand the build pass.🤖 Generated with Claude Code