Skip to content

docs(ramble): handoff — map arc shipped 0.9.0-0.9.5, phase 2 is hearts not the shop - #337

Open
kh0pper wants to merge 1 commit into
mainfrom
docs/ramble-phase1-handoff-and-phase2
Open

docs(ramble): handoff — map arc shipped 0.9.0-0.9.5, phase 2 is hearts not the shop#337
kh0pper wants to merge 1 commit into
mainfrom
docs/ramble-phase1-handoff-and-phase2

Conversation

@kh0pper

@kh0pper kh0pper commented Sep 9, 2026

Copy link
Copy Markdown
Owner

Session handoff closing the Ramble map arc and setting up phase 2.

Records all six releases and what each fixed, the live state on grackle, what phase 2 has to build, and the hard-won lessons a fresh session would otherwise rediscover — the spend-key constraint for phase 4, that the map and the payout must read the same rule, that a state-gated feature has to say what existing users see at upgrade, and how sparsity breaks ledger tests.

The correction worth reading: the operator asked about the seed shop and then said to proceed through the planned phases. Phase 2 is heart containers and maximum energy — the shop is phase 4. A fresh session picking up "phase 2" would otherwise build the wrong thing. Also flags that seed is earn-only until phase 4 by design, which the operator has noticed, and that it is worth confirming he still wants strict phase order.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant