Summary

Workplan-sync after P5F-1 disk-backed per-project trust reader shipped via PR #145 (squash 08a9be6). Updates the two workplan pointer files to the new canonical episodic-memory episode head 20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3 (supersedes the P5F-plan-accepted head 20260704-141949-...a0b1).

Changes

  • WORKPLAN.md — current-state block: P5F-1 COMPLETE (P5F-1: disk-backed per-project trust reader (pure extraction) [codex APPROVED] #145, 08a9be6); next = P5F-2 writer+resolver step-tables (author + plan-review). Chain head, revises, tags, summary all updated to the new episode. Follow-up bullet flipped from "P5F-1 (NEXT)" to "P5F-1 COMPLETE" + new "P5F-2 (NEXT)".
  • agents/P3_IMPLEMENTATION_SLICES.md — P5F section: P5F-1 marked SHIPPED (with the R1→R2 codex consensus fix trail + 13/13 tests + INV-2/REQ-10/REQ-11 evidence), P5F-2 marked NEXT (Appendix B step-tables deferred by design — now to be authored + plan-reviewed since the reader held up under the 13 P5F-1 tests), P5F-3 deferral note updated from post-P5F-1-review to post-P5F-2-review.

Also documents the closure of stale PR #140 (workplan-sync after P5b-2) which was CONFLICTING/DIRTY and fully superseded by #138/#142/#143/#144 — force-merging would have rewound the workplan pointer to a stale episode.

Source of truth

The episodic-memory episode 20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3 (tag canonical-workplan, local scope) is canonical; these two markdown files are convenience references synced per project-runbook:workplan-update.md.

Docs-only. No code changes.

…, 08a9be6)

P5F-1 disk-backed per-project trust reader merged via PR #145 (squash
`08a9be6`). Updates the two workplan pointer files to the new canonical
episode head `20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3`
(supersedes the P5F-plan-accepted head `20260704-141949-...a0b1`).

Changes:
- WORKPLAN.md — current-state block: P5F-1 COMPLETE (#145, 08a9be6); P5F-2
  writer+resolver step-tables (author + plan-review) is next. Chain head,
  revises, tags, summary all updated to the new episode. Follow-up bullet
  flipped from "P5F-1 (NEXT)" to "P5F-1 COMPLETE" + new "P5F-2 (NEXT)".
- agents/P3_IMPLEMENTATION_SLICES.md — P5F section: P5F-1 marked SHIPPED
  (with the R1→R2 consensus fix trail + 13/13 tests + INV/REQ evidence),
  P5F-2 marked NEXT (step-tables deferred by design — now to be authored
  + plan-reviewed since the reader held up under the 13 P5F-1 tests),
  P5F-3 deferral note dropped from post-P5F-1-review to post-P5F-2-review.

Also documents the closure of stale PR #140 (workplan-sync after P5b-2)
which was CONFLICTING/DIRTY and fully superseded by #138/#142/#143/#144.

The episodic memory episode is canonical; these markdown files are
convenience references synced per project-runbook:workplan-update.md.

Co-Authored-By: Claude <noreply@anthropic.com>
@lantiscooperdev
lantiscooperdev merged commit d15ff67 into main Jul 5, 2026
1 check passed
@lantisprime
lantisprime deleted the docs/workplan-sync-p5f-1-complete branch July 5, 2026 13:09
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants