Skip to content

Fix UI stuck on testing after Stream Quality already ended - #6

Merged
lop-spec merged 1 commit into
mainfrom
fix/probe-terminal-state
Sep 16, 2026
Merged

lop-spec merged 1 commit into
mainfrom
fix/probe-terminal-state

Conversation

@lop-spec

Copy link
Copy Markdown
Owner

Pin upstream stream-quality Windows terminal pipe lifecycle fix, plus two real-process native-adapter regressions proving ownership/listener/private-job cleanup after endpoint failure and validation failure. 97/97 local tests pass. No UI design, protocol, routing, daily-core, selection or workload changes; pending UI state now reaches existing finally block on natural worker exit. Stable main baseline; does not include parallel-SSE candidate or separate UI-polish branch.

@lop-spec
lop-spec merged commit ce542d2 into main Sep 16, 2026
1 check passed
@lop-spec
lop-spec deleted the fix/probe-terminal-state branch September 16, 2026 13:33
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant