You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Flip MIP-0086's status to Implemented, naming each task's PRs, in the MIP's metadata block and in its docs/MIPs/README.md row. Leave the Cost so far row as it is: the README says that row is no longer kept up since the Cost: trailer was dropped (marola-dev/marola-devkit#103, #794).
Every task row's PRs are merged. Row 13 (#740) waits only for its live auto-merge proof, which is #740's own acceptance criterion; row 15 does not depend on rows 13 or 14 (the tasks file's depends on column).
Acceptance criteria
the MIP's Status row and its README row say Implemented and name each task's PRs
mip_graph.py --check green
Named test
scripts/mip_graph.py --check.
MIP-0086 owns the design and its tasks file the order; this issue owns the status. Blockers are native blocked by edges from the tasks file's depends on column.
Activity