131 changes: 131 additions & 0 deletions docs/architecture/LIVE_PROJECT_ROADMAP_MANAGEMENT_V1.md
Original file line number Diff line number Diff line change
Expand Up @@ -178,6 +178,137 @@ from a changing Mission denominator, and no dummy next Mission when no work rema
Read-only/docs/design outcomes retain their effect and artifact semantics; a report
or approved design is not permission to implement the recommendation.

## Project-loop authority refinement — 17 September 2026

Owner-requested refinement `PROJECT_LOOP_AUTHORITY_2026_09_17`, observed against
Forge `107936d56223a3fa9fef4b6d2ac6b831d97ff9d2` and Workspace
`eb6c656a92d71666cb493059d517fd174857855d`. These are historical design bases,
not live activation evidence. This section refines the existing contract and DAG;
it creates no second backlog, scheduler, policy engine or executable programme.

### Inner loop versus project loop

The inner loop dynamically derives 1..n Actions inside one authorized Mission.
The project loop reconciles results, updates the roadmap, proposes new work and
releases a subsequent Mission only under its own current authority. A successful
single-Mission multi-Action test does not qualify that second loop. Mission 3's
already fixed acceptance, zero-retry requirement and attempt identity are not
expanded, reset or satisfied by this documentary refinement. Production repair
policy remains separately governed; the strict canary is not a blanket policy.

### Automatic facts; governed direction

Record authenticated approval, release, dispatch, EP admission, actual start,
wait/block, failure, cancellation, partial delivery, terminal outcome, Forge
reconciliation and required acceptance as separate source-backed facts. Preserve
all actual statuses and unknowns; no current approval click is required merely
to record a verified event. Facts must not promote a proposal into approved work.

The canonical project authority repository owns approved roadmap direction and
policy definitions. Forge owns the runtime decisions/evidence and their live
projection. Persist factual state promptly in Forge, then publish meaningful
milestone snapshots to the designated repository through the existing authorized
EP/repository-delivery route. Forge does not acquire a direct target-Git writer.

The repository projection contract pins project, repository, allowed paths,
source snapshot/event identity, policy revision, expected base and publication
operation. Use bounded coalescing, compare-and-swap, protected delivery and
idempotent readback. Preserve human-authored goals, priority decisions and old
evidence; generated progress sections never silently replace approved direction.
A publication conflict yields a visible pending/conflicting projection, not a
rewritten execution result or permission to bypass branch protection. Publish
runtime freshness and repository freshness separately. Reconcile the same
publication operation after uncertainty, not a new product Mission.

Every event need not create a Git commit. Approval, start, material block/change
and terminal reconciliation are meaningful publication boundaries under policy.
A projection's own commit must not recursively generate another Mission,
reprioritization or infinite projection commit. A final projection cannot require
its own as-yet-nonexistent commit as completion evidence. No source-SHA/request-
baseline mutation of already dispatched Actions; publication is a distinct effect.

### Three project modes, independent of release and review cadence

These names are PLANNED policy vocabulary, not shipped enums or an active default.
The recommended default is MISSION_RELEASE; existing effective policies do not
change by reading or merging this document.

| Mode | Permitted selection | New scope and committed priority |
| --- | --- | --- |
| MISSION_RELEASE | Execute a specifically approved and released Mission; propose what follows | Applicable Business/Architecture decisions and explicit release remain human-governed unless independently covered by existing authority |
| APPROVED_WORKLIST | Progress through an explicitly approved finite workset whose exact subjects have valid AUTO_WHEN_ELIGIBLE release | Forge cannot add findings, replace subjects or change committed order without an authorized amendment |
| DELEGATED_DEVELOPMENT | Select, refine, prioritize and release new work only through a qualified bounded delegation | Requires separately authorized policy/grant and exact auditable subject decisions; selecting the mode supplies none of these |

An approved workset pins subject revisions, membership, ordering or a specifically
approved deterministic selection rule, dependencies, limits and release choices.
Recommendations remain separately visible. Default: wait when the next committed
item is ineligible; skipping or reordering requires the approved selector to
explicitly permit it. Never silently promote a newly found Candidate as the
"most important" next Mission. Exhausted worksets go idle and present proposals.

Business owns value, cost and timing; Architecture owns technical scope and risk.
Their required decisions remain distinct even when one authorized person holds
both roles. Valid prior approval is not requested again just to release work.
A human may select any eligible authorized backlog item instead of Forge's top
recommendation; this does not waive prerequisites or amend a frozen subject.
UI sorting is not a priority decision. A priority proposal binds old/new order,
exact subjects, evidence, impact, proposer and required decision to a revision.
Approval of scope, committed priority, permission to start and actual activation
are orthogonal and separately audited.

DELEGATED_DEVELOPMENT is not unrestricted self-approval. Its planned capability
must reconcile the existing human-governed Business/Architecture contracts with
an explicitly permitted delegated decision path before use. A mandatory personal
human decision remains mandatory unless separately governed policy legitimately
changes that obligation. Mode selection cannot rewrite that policy. Missing or
unsupported delegation support means wait/unsupported, not fabricated approval.

A delegation names issuer, delegated decision roles, goals, repositories/effects,
risk exclusions, selection rule, time/budget/Mission ceilings, validity, revocation,
stop conditions and exact policy revision. Decisions identify their real delegated
actor and grant, not an invented human signer. Candidate proposal is never its
own approval evidence. Recheck grants and remaining ceilings at selection,
approval, release and protected effects; preserve consumption across Missions,
restarts and mode changes. EP assurance, merge/publish/deploy authority, mandatory
human gates and emergency fences remain independent. Forge cannot widen its own
goals/grants or relabel risk to continue. Unknown applicability escalates.

### Findings become proposals, not commands

EP and review agents report evidence; they do not own backlog priority. Classify
findings against the current Mission before deciding what follows:

- A violated current acceptance criterion remains a current delivery/acceptance
problem; moving it to a Candidate cannot make that Mission pass. Use only the
authorized repair/progression policy or a governed amendment.
- Non-blocking out-of-scope work becomes an evidence-linked new or refined
Candidate and a priority recommendation. It has no executable authority.
- Duplicate, superseded, accepted-risk, deferred or rejected findings retain
their disposition and rationale. Reopen only for materially changed evidence
with the applicable decision; do not repeatedly regenerate rejected work.

Record finding identity, origin run/Action/candidate, source evidence, impact,
uncertainty, scope classification, links to existing work and proposed disposition.
Candidate refinement is versioned and cannot overwrite approved/human edits.
Severity is a proposal input, not a priority grant. An urgent finding may trigger
an authorized scoped safety hold, but a hold is not authority for a broader fix.
Completion may legitimately leave accepted non-blocking follow-up Candidates.

### Qualification slices and the next-Mission boundary

Qualify manual release, approved-worklist continuation and delegated development
as distinct slices. A two-Mission positive case alone is insufficient: after M1,
prove that an unapproved high-priority finding cannot replace already approved M2;
that a human can choose a different eligible item; and that a stopped/expired
delegation cannot launch more work. Use real owning decision/intake APIs, not
approved rows injected by the test driver. Include all failure/block/cancellation
and repository-projection boundaries, not only terminal success.

PMT-25..36 in the shared registry capture these additional cases. Documentary
checks prove graph/contract consistency only. Neither this merge nor an inner-loop
PASS is project-loop qualification, an automatic backlog approval, or an instruction
to start another Mission.

## Interfaces, rollout and evidence

Workspace Client -> Workspace Server -> Forge/EP and Forge -> EP remain authenticated,
Expand Down
52 changes: 48 additions & 4 deletions docs/roadmap/LIVE_PROJECT_ROADMAP_MANAGEMENT_V1.md
Original file line number Diff line number Diff line change
Expand Up @@ -14,12 +14,15 @@ F5 is not a scheduler; its parent refinement is navigation, not a backward edge.
| --- | --- | --- |
| PRM-F-CONTRACT | Versioned project/readiness/change contracts and identity mapping | none |
| PRM-F-PROJECTION | Consistent project roadmap snapshot and HTTP read projection | PRM-F-CONTRACT |
| PRM-F-ELIGIBILITY | Current condition-vector and approved-pending interpretation | PRM-F-CONTRACT |
| PRM-F-ELIGIBILITY | Current condition-vector and approved-pending interpretation | PRM-F-CONTRACT, PRM-F-PRIORITY |
| PRM-F-ACTIVATION | Existing-runtime guarded intake/activation and recovery | PRM-F-ELIGIBILITY |
| PRM-F-CHANGES | Source-backed iteration deltas and advisory expectation refresh | PRM-F-PROJECTION |
| PRM-F-Q | Installed service, restart and outer-loop qualification | PRM-F-ACTIVATION, PRM-F-CHANGES |
| PRM-F-CHANGES | Source-backed lifecycle deltas, disposition-aware finding triage and advisory expectation refresh | PRM-F-PROJECTION |
| PRM-F-PRIORITY | Recommended versus committed order, exact approved worksets and versioned Business/Architecture decisions | PRM-F-CONTRACT, PRM-F-CHANGES |
| PRM-F-REPOSITORY | Idempotent milestone projection through authorized EP repository delivery with separate runtime/repository freshness | PRM-F-CHANGES |
| PRM-F-DELEGATION | Explicit bounded delegated project decisions without implicit approval or mandate expansion | PRM-F-PRIORITY, PRM-F-ACTIVATION |
| PRM-F-Q | Installed service, restart and separately scoped project-mode qualification | PRM-F-ACTIVATION, PRM-F-CHANGES, PRM-F-REPOSITORY, PRM-F-DELEGATION |

All nodes remain PLANNED with empty qualification evidence. External evidence
All nine nodes remain PLANNED with empty qualification evidence. External evidence
is a real producer subset, not permission to allocate peer implementation.

PRM-F-PROJECTION consumes F2/FH operation/HTTP subsets. PRM-F-ELIGIBILITY and
Expand All @@ -34,6 +37,35 @@ projection may ship before activation. A qualified headless activation slice
may ship before Workspace management; PRM-F-Q is integrated full-family proof,
not a prerequisite for every independent bounded implementation.

## Project-loop refinement and scoped rollout

`PROJECT_LOOP_AUTHORITY_2026_09_17` adds explicit work for the owner-requested
boundary between automatic facts and governed direction. PRM-F-CHANGES classifies
findings without turning them into commands. PRM-F-PRIORITY keeps recommendations
separate from the committed sequence and freezes exact approved workset membership.
PRM-F-REPOSITORY plans bounded publication through the existing EP delivery owner,
not a direct Forge filesystem/Git writer. Conflicts preserve execution evidence
and show repository freshness independently; projection commits cannot recursively
start product work.

The planned project modes are MISSION_RELEASE, APPROVED_WORKLIST and
DELEGATED_DEVELOPMENT. They are independent of MANUAL_RELEASE/AUTO_WHEN_ELIGIBLE
and intermediate review cadence. MISSION_RELEASE is the recommended design default,
not an activated setting. APPROVED_WORKLIST may progress only under its exact
approved selector and limits; findings cannot silently enlarge it.

PRM-F-DELEGATION is an additional qualified capability, not permission conferred
by a mode selector. It requires separately governed delegated decision roles,
exact subject decisions, time/scope/budget limits and current grants. It cannot
waive mandatory human, assurance, merge or deployment gates. Standard manual and
approved-worklist slices need not wait for full delegated development. Full-family
PRM-F-Q includes all nodes; slice qualification must name its actually supported
subset and relevant PMT cases.

Mission 3 proves a single-Mission inner loop only. Its existing scope, zero-retry
acceptance and telemetry/reporting conditions are unchanged. This roadmap adds
no prerequisite or successor Mission to that attempt and does not start anything.

## Shared mandatory future acceptance

PMT IDs are shared with the companion repository; keep IDs and meanings aligned.
Expand Down Expand Up @@ -65,6 +97,18 @@ They extend the relevant service/inner/outer/UI layers, not a second simulator.
| PMT-22 | Failed/ambiguous predecessor never grants new authority or fresh repair budget under a replacement Mission | SERVICE_OUTER |
| PMT-23 | Missing API/capability or peer outage has no CLI/import/SQL/Inbox/IPC fallback; read-only rollout labels unsupported controls | SERVICE_UI |
| PMT-24 | No remaining project gap yields bounded idle and no fabricated Expected/Candidate/Mission or extra provider call | OUTER_LOOP |
| PMT-25 | Approval, dispatch, admission, running, blocked, failed, cancelled, partial delivery, reconciliation and acceptance remain distinct automatic facts | SERVICE_OUTER_UI |
| PMT-26 | Authorized repository milestone projection preserves approved direction and separate freshness; duplicate, conflict or self-generated commit cannot start work | SERVICE_OUTER_UI |
| PMT-27 | Out-of-scope reviewer findings create evidence-linked proposals, never new execution authority; urgent scoped stop is not permission to fix | OUTER_LOOP |
| PMT-28 | A current acceptance defect cannot be hidden in a follow-up Candidate to claim success; governed repair or amendment remains required | INNER_OUTER_UI |
| PMT-29 | Duplicate, rejected, deferred and accepted-risk findings preserve disposition; changed evidence may propose but not silently approve reopening | SERVICE_OUTER_UI |
| PMT-30 | Human choice of any eligible authorized item may override the recommendation without bypassing dependencies; sorting never changes committed order | SERVICE_UI |
| PMT-31 | APPROVED_WORKLIST executes only exact approved released subjects under the committed selector; high-ranked new findings cannot join or reorder it | OUTER_LOOP |
| PMT-32 | DELEGATED_DEVELOPMENT requires qualified explicit role grants and exact auditable decisions; mode selection never replaces mandatory human gates | SERVICE_OUTER_UI |
| PMT-33 | Delegation scope, expiry, revocation and consumed limits survive successor Missions, restart and mode switch; unknown authority stops release | SERVICE_OUTER |
| PMT-34 | Priority and workset amendments bind exact revisions, impact and role decisions; stale or concurrent commands cannot broaden authorization | SERVICE_UI |
| PMT-35 | Single-Mission multi-Action proof cannot qualify the project loop or alter Mission 3 acceptance; qualification slices remain separate | INNER_OUTER_UI |
| PMT-36 | Capability contribution and acceptance remain many-to-many and evidence-bound; completed Mission counts or published projections cannot prove product completion | SERVICE_UI |

The later outer-loop cases add a second positive path: create pending M2's
Candidate, real separate approvals and bounded automatic release through public
Expand Down
Loading
Loading