docs: bounded parallel Actions within one Mission (NO_BUMP) - #134
Merged
Merged
Conversation
Owner
Author
|
Author-side documentary review for head
Exact-head repository CI is still pending; protected delivery must wait for its actual required result. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Owner-requested architectural refinement
The owner requested that independent Engineering Actions within one Forge Mission can be planned and executed concurrently by EP, rather than inheriting the current serial
_OneActionProvider/single-target runtime limit. This is the next bounded documentation update in the existing protected design-delivery workflow, not an implementation or runtime instruction.Changes
EP companion branch:
codex/parallel-action-execution-v1-design(six owning nodes). Workspace/full fleet/native subagents are not new prerequisites. Serial Mission 3 and the active reset work stay unchanged. No code, package/version, workflow, policy/grant, credential, database, installation, Mission or paid provider execution changes.Validation at creation
Exact-head CI and author-side documentary/DAG review pending. No local full product-suite or installed concurrency qualification claimed. Merge must respect actual repository-required checks/reviews and the exact reviewed head; no protection bypass or fabricated independent assurance.