fix(pb_heater): approach cap stalled the chamber below setpoint since v1.1.16 - #103

Merged
plastikman merged 3 commits into
mainfrom
fix/pid-approach-cap-hold
Sep 20, 2026
Merged

plastikman merged 3 commits into
mainfrom
fix/pid-approach-cap-hold

Conversation

@plastikman

Copy link
Copy Markdown
Owner

Problem

Since v1.1.16 the chamber controller can't hold setpoint — it stalls ~2 °C low ("gets to 64, can't reach 65"). v1.1.15 held.

Root cause: the approach cap in pb_heater_pid.h limited SSR duty by chamber distance-to-target (40% within 2 °C, 70% within 5 °C). That clamped the steady-state hold, creating a stable attractor at target − 2 °C for any enclosure whose hold duty exceeds the cap, and integral_max = output_max − proportional stopped the integrator from compensating. It also throttled the element below its safe capability, adding SSR duty-modulation (wear) the prior bang-bang firmware never had — the concern Justin raised about frequent SSR trips.

The element (PTC) foldback already in pb_heater.c is the correct near-target limiter (a real thermal/safety limit). The chamber-error cap ceilinged the wrong variable.

Fix

  • Rate-gated soft anti-overshoot (pb_heater_pid_approach_soft_cap): full authority unless within 3 °C of target and genuinely climbing (>0.06 °C/s), so a settled/oscillating hold is never clamped, while a fast approach on a low-loss enclosure still gets overshoot damping. integral_max frees up at hold.
  • EMA-filtered gate rate (α 0.20): the NTC reports in ~0.1 °C steps, so a single tick spikes the one-sample rate to ~0.2 °C/s and would flicker the cap through the whole hold. Filtering rejects isolated ticks while a sustained climb still registers (bench: 27% → 8% of hold samples capped).
  • SSR wear: widen the time-proportioning window 10 s → 30 s + a 2 s minimum on/off dwell (steady-state switching 12/min → ~4/min).
  • Applied soft cap reported via state->last_approach_cap telemetry (DragonSniff//diag still see when damping is active).

Fixed safety cutoffs (105 °C PTC / 85 °C chamber / 70 °C target) untouched. All DragonBreath-side — no dc_pid change.

Bench validation (enclosed U1, 65 °C target, bed 100 °C)

chamber hold vs 65 SSR/min chamber cap
v1.1.18 (bug) 62.9 °C −2.1 12 pinned 0.40–0.70
v1.1.15 (good) 64.3 °C −0.7 2.3 n/a
this fix 64.3 °C −0.7 4.4 released (1.0)

The fix recovers v1.1.15's reach exactly and cuts SSR switching ~63% vs the bug. Raising the already-exposed fb_cut advanced setting 102 → 103 °C then reached and held a full 65.0 °C on the same rig, with the element still ~90 °C at steady state (huge margin to the 105 °C cutoff) — so fb_cut is the per-enclosure element-headroom knob for lossy setups.

Tests

Host suite (tests/pb_heater_pid_host_test.c) rewritten to cover the soft cap, EMA quantization-spike rejection, the 30 s window + dwell, a settled hold reaching full authority, and fast-approach damping. All four heater/policy host suites pass; firmware builds (esp32c3).

Follow-ups (not in this PR)

  • Optional: expose SSR window / soft-cap params as advanced settings (foldback-chain mirror) — deferred since fb_cut already covers the highest-impact knob.
  • The residual ~8% plateau flicker could go to ~0 by latching the anti-overshoot off after target is first reached this session — a small state-machine change worth discussing separately.

🤖 Generated with Claude Code

https://claude.ai/code/session_012B9YKQ5yUenkyDUqdbn6HP

plastikman and others added 2 commits September 15, 2026 20:08
…old below setpoint

Since v1.1.16 the chamber controller could not hold setpoint -- it stalled
~2 C low ("gets to 64, can't reach 65"). Root cause is the approach cap in
pb_heater_pid.h, which limited SSR duty by chamber distance-to-target (40%
within 2 C, 70% within 5 C). That clamped the STEADY-STATE hold, creating a
stable attractor at target-2 C for any enclosure whose hold duty exceeds the
cap, and integral_max = output_max - proportional prevented the integrator
from compensating. It also throttled the element below its safe capability,
adding SSR duty-modulation (wear) the prior bang-bang firmware did not have.

Bench-validated on an enclosed U1 (65 C target, bed 100 C):
  v1.1.18 (bug):  chamber 62.9 C, SSR 12/min, duty capped 0.40-0.70
  v1.1.15 (good): chamber 64.3 C, SSR 2.3/min (element-foldback limited)
  this fix:       chamber 64.3 C, SSR 4.4/min, approach cap released at hold
The element (PTC) foldback in pb_heater.c is the correct near-target limiter
(a real thermal/safety limit); the chamber-error cap ceilinged the wrong
variable.

Changes:
- Replace the chamber-error cap with a rate-gated SOFT anti-overshoot
  (pb_heater_pid_approach_soft_cap): full authority unless within 3 C of
  target AND genuinely climbing (>0.06 C/s), so a settled/oscillating hold is
  never clamped while a fast approach on a low-loss enclosure still gets
  overshoot damping. The gate rate is EMA-filtered (alpha 0.20) to reject the
  ~0.1 C NTC quantization ticks that otherwise spike the one-sample rate to
  ~0.2 C/s and flicker the cap through the hold (bench: 27% -> 8% of samples).
- Widen the SSR time-proportioning window 10 s -> 30 s and add a 2 s minimum
  on/off dwell, cutting steady-state SSR switching (12/min -> ~4/min).
- Report the applied soft cap via state->last_approach_cap telemetry.

Fixed safety cutoffs (105 C PTC / 85 C chamber / 70 C target) are untouched.
The already-exposed fb_cut advanced setting (default 102 C) remains the
per-enclosure element-headroom knob: raising it to 103 C let the same rig
reach a full 65 C hold with the element still ~90 C at steady state.

Host tests updated for the soft cap, EMA quantization rejection, the 30 s
window + dwell, and a settled hold reaching full authority.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_012B9YKQ5yUenkyDUqdbn6HP
Release notes for the v1.1.19-rc1 prerelease; the release workflow pulls this
section into the GitHub Release. Content only — no code change.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_012B9YKQ5yUenkyDUqdbn6HP
@plastikman
plastikman merged commit 3563026 into main Sep 20, 2026
1 check passed
plastikman added a commit that referenced this pull request Sep 23, 2026
Consolidates rc1/rc2 into the 1.1.19 release: selectable Bang-Bang/PID
chamber control (#95), configurable hostname, the approach-cap hold fix
(#103), and follow-the-filament material detection (#65). Both follow-the-
filament and heater-method tested good on hardware.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment