Repository navigation
docs(plans): record 2026-11-13 owner decisions (D1-D7) - #283
Conversation
|
Important Review skippedAuto incremental reviews are disabled on this repository. Please check the settings in the CodeRabbit UI or the
|
Review: 2026-11-13 owner decision record — Approve with fixes
The disposition tables and the head SHA cited for #284 ( Generated by Claude Code |
|
@coderabbitai review |
Action not completed
|
There was a problem hiding this comment.
Note
Copilot was unable to complete this review at the selected tier due to model policy or plan restrictions.
🟡 Changes recommended
Approval is held because there are active documentation nits that could mislead readers (ambiguous status phrasing and a broken/missing referenced proposal link) and need clarification to keep status tracking and references unambiguous.
3 open issues
What changed in this PR
Records the project owner’s 2026-11-13 decision outcomes (D1–D7) in planning documentation, including a dedicated F06 G0 values approval record, and updates related 2026-11-12 plan/batch docs to reflect DECIDED status and current execution/deferral notes.
Changes:
- Add an owner decision record capturing D1–D7 dispositions and what each unblocks/gates/defers.
- Add a standalone F06 G0 values approval record documenting the approved values and scope.
- Update the 2026-11-12 decision-batch and remaining-work completion plan to reflect the decided status and updated downstream notes.
| File | Description |
|---|---|
| docs/plans/2026-11-13-owner-decision-record.md | Adds a canonical decision record for D1–D7, including dispositions and summaries of what is unblocked, still gated, and deferred. |
| docs/plans/2026-11-13-f06-g0-approval.md | Introduces a dedicated document recording the owner’s approval of the proposed F06 G0 readiness-gate values and clarifying scope/limits. |
| docs/plans/2026-11-12-remaining-work-completion-plan.md | Updates completion-plan status text to reflect the recorded owner decisions, approvals, and current delivery/dispatch notes. |
| docs/plans/2026-11-12-owner-decision-batch.md | Marks the 2026-11-12 owner decision batch as DECIDED and points readers to the corresponding decision record. |
Review effort: Balanced
| `2026-11-13-f06-g0-approval.md`). G0 preparation unblocked; authentic | ||
| sessions remain human-only (recruitment, consent, facilitation, | ||
| adjudication, evidence). Drafting-first; mapping execution deferred to | ||
| F17. Live-model latency gate unblocked (F16 delivered). |
There was a problem hiding this comment.
Fixed in 54f3cc5: rephrased to "Live-model latency gate no longer blocked by F16 (delivered); latency measurement + owner approval still pending" — makes explicit that the gate is unblocked but measurement/approval remain pending. Applied the same clarification to the F16 status line.
| # F06 G0 readiness-gate approval — 2026-11-13 | ||
|
|
||
| Status: **OWNER-APPROVED 2026-11-13.** The project owner (Brian Luby) | ||
| reviewed the [G0 proposal](2026-11-13-f06-g0-proposal.md) (PR #284, head |
| - **Live-model latency gate stays BLOCKED on F16** (no number invented); | ||
| recorded-response mode carries no latency/cost claim. |
There was a problem hiding this comment.
…ered, F12F13 final)
…deRabbit findings)
54f3cc5 to
97b1c5e
Compare

Records the owner's interactive decisions of 2026-11-13 (three batches) plus the F06 G0 approval, and updates the decision-batch status to DECIDED.
Contents:
Executed: D2 (13 retained-evidence alerts dismissed, 0 open). D1/D1b approved on P0 branch. D3 settled (#264 closed for #268).
Approved designs: D067 (F11 ratify + re-pin), F16 Unix-first, F12 M-10, M-13/M-15, F10 Q1-Q7, D068, F22 support policy, MSRV CI job, G0 values.
Deferred post-2.0.0: F15 Phase 2, S-2 signed envelopes, private disclosure channel, Windows confinement.
Docs-only. Implementation batch dispatched: F16 Unix confinement, F12/F13 adapters, F11 conformance, MSRV CI + F03 note.