Skip to content

Adopt AI-harness operations baseline v1.4.0 (ADR 0014) - #1

Merged
pt9912 merged 5 commits into
mainfrom
feat/adopt-operations-baseline
Jul 16, 2026
Merged

Adopt AI-harness operations baseline v1.4.0 (ADR 0014)#1
pt9912 merged 5 commits into
mainfrom
feat/adopt-operations-baseline

Conversation

@pt9912

@pt9912 pt9912 commented Jul 16, 2026

Copy link
Copy Markdown
Owner

Was

Adoptiert das AI-Harness-Betriebsregelwerk (v1.4.0) als committed-vendored Baseline in bess-ems — additiv über die bestehende, schärfere Gate-/Doku-Infrastruktur. Entscheidung: ADR 0014 (Accepted).

Commits

  • docs(adr) ADR 0014 — Adoptions-Entscheidung (Accepted, Owner-Sign-off)
  • feat(harness) Vendored Regelwerk v1.4.0 (21 Dateien) + SHA256SUMS + .d-check.yml/.gitignore Scan-Konfig
  • feat(harness) AGENTS.md + harness/{README,conventions}.md + tools/harness/fetch-baseline-cache.sh
  • feat(planning) Planning-Gate aktiv: ## Aktuelle Welle (Idle-Marker) + planning:-Config

Dokumentierte Abweichungen (MR-* in harness/conventions.md)

  • MR-000 Baseline-Aussage (v1.4.0)
  • MR-001 eigenes d-check.mk v0.42.0 + voller Modulsatz statt Baseline-harness.mk
  • MR-002 kategoriebasiertes LH-<KAT>-<NN> statt LH-FA/QA
  • MR-003 Bestand meilenstein-gebunden; Welle/Slice-Lifecycle vorwärts, Bestand grandfathered
  • MR-004 committet-vendored Lese-Form, keine .claude-Hooks / kein harness.mk

Bewusst nicht enthalten

Keine Enforcement-Hooks. Der retroaktive M1–M6 → orthogonaler-Welle/Meilenstein-Umbau ist aufgeschoben mit Trigger (ADR 0014 §8 / MR-003 — erste neue, aktiv geplante Arbeitswelle).

Verifikation

  • tools/harness/fetch-baseline-cache.sh --verify → 21/21 OK (netzlose Integrität)
  • make docs-check → 0 Befunde, beide Sub-Gates (matrix adr↛plan, tracked grün); planning ist jetzt echt gegated statt No-op
  • Kein Produktcode berührt → make gates nicht erforderlich

🤖 Generated with Claude Code

pt9912 and others added 5 commits July 16, 2026 08:05
…red, Proposed)

Records the decision to adopt the external AI-harness operations baseline
(v1.4.0) as a committed-vendored process canon, additively over bess-ems's
existing stricter gates, with deviations tracked as MR-* in
harness/conventions.md. Retroactive milestone/wave roadmap restructure is
deferred with trigger (ADR 0014 §8).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Committed-vendored per ADR 0014 (MR-007): the AI-harness operations baseline
regelwerk (21 split-module files) lands under
.harness/baseline/v1.4.0/regelwerk/ with a SHA256SUMS integrity manifest —
netless, offline-verifiable. .d-check.yml scan.ignore excludes the vendored
foreign content (hundreds of upstream links are not our references);
.gitignore ignores only the ephemeral .harness/cache/. make docs-check stays
green (0 findings, 85 files).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
…ing (ADR 0014 §3)

Governance pointer layer over the vendored operations baseline: AGENTS.md (hard
rules, source precedence, read-one-module-per-session), harness/README.md
(source precedence, sensors), harness/conventions.md (Baseline + MR-000..MR-004
adaptations), and tools/harness/fetch-baseline-cache.sh (offline --verify via
SHA256SUMS, re-vendor via the conventions §Baseline tag). No .claude hooks and
no harness.mk (MR-004). make docs-check green; --verify green (21/21).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
…le marker (ADR 0014 §3)

Adds a "## Aktuelle Welle" block to the roadmap carrying the idle marker
"Keine aktive Welle" (all milestones M1–M6 done; current work is trigger-driven
follow-ups; the wave/slice lifecycle is adopted forward per ADR 0014 §8 and
harness/conventions.md MR-003). Enables the d-check `planning` module in
.d-check.yml (modules + config), so the roadmap-to-in-progress lifecycle
invariant is now genuinely gated instead of a silent no-op. make doc-planning
and make docs-check both green (0 findings).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Owner sign-off 2026-07-16 (pt9912). Status Proposed -> Accepted and a Geschichte
row added; no content change beyond the status transition.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
@pt9912
pt9912 merged commit f96d264 into main Jul 16, 2026
1 check passed
@pt9912
pt9912 deleted the feat/adopt-operations-baseline branch July 16, 2026 09:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant