Updates docs/ROADMAP-AI-V3.md and its Chinese mirror to reflect what's actually been built, so the roadmap stops reading as "design, not scheduled."

Changes (docs only)

  • Status line → in-progress, with last-updated date and a pointer to the new Progress section.
  • New ## Progress section — a shipped-milestones table with PR links and one-line summaries, plus an explicit "not started — gated on live infrastructure" list so the boundary between done-in-code and needs-real-infra is unambiguous.
  • Status column on both milestone tables:
    • Feature A: A0–A6 all ✅ (#107/#110/#114/#120/#122); A0 noted as 7 ADRs (not the planned 5 — review added data-availability + verification-economics); A5/A6 flag the node-side/live-deployment parts still gated.
    • Feature B: B0–B2 ✅ (#102); new WAN-spike row ✅ (#124); B3–B5 ⛔ gated.
  • B-2 narrative now carries the spike verdict (ADR-0011): interactive over WAN = no-go; batch-only, bandwidth/locality-aware, activation-compressed; build gated on real cross-region measurement.
  • Sequencing note: the recommended B-1 → A → B-2 order was executed.
  • zh mirror kept in sync with the same edits.

No code changes.

🤖 Generated with Claude Code

…e shipped

Update ROADMAP-AI-V3.md (+ zh mirror) to reflect actual status:
- Status line + new Progress section with the shipped milestones and PRs
  (B-1 #102; A0-A2 #107; A3 #110; A4 #114; A5 #120; A6 #122; B-2 spike #124).
- Status column on both milestone tables; A0 shipped as 7 ADRs not 5;
  A5/A6 note the node-side/live-deployment parts that remain gated.
- B-2 section reflects the spike verdict (ADR-0011): interactive WAN =
  no-go, batch-only + bandwidth/locality-aware + activation compression;
  B3-B5 gated on real cross-region miner-to-miner measurement.
- Sequencing note: B-1 -> A -> B-2 order executed as recommended.

Docs only.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@lai3d lai3d merged commit ce9593d into main Jun 14, 2026
4 checks passed
@lai3d lai3d deleted the claude/roadmap-ai-v3-status branch June 14, 2026 15:55
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant