Skip to content

bazel: handle generated protos from external repos - #45

Merged
aviator-app[bot] merged 2 commits into
mainfrom
rjh.cross-repo
Feb 16, 2026
Merged

bazel: handle generated protos from external repos#45
aviator-app[bot] merged 2 commits into
mainfrom
rjh.cross-repo

Re-add `.mergequeue/config.ml` post UI-based fix

fc15160
Select commit
Loading
Failed to load commit list.
Aviator app / aviator/checks succeeded Feb 16, 2026 in 0s

Aviator checks - All validations completed.

This PR is queued for merge (review queue position).

It will be merged when it reaches the top of the queue and all required status checks are passing.

Pending Status Checks

This pull request has no reported status checks.