chore(deps): update konflux references (release-1.20)#976
Merged
Red Hat Konflux / Red Hat Konflux / gitops-1-20-on-pull-request
succeeded
Jun 20, 2026 in 15m 32s
Success
Red Hat Konflux/gitops-1-20-on-pull-request has successfully validated your commit.
Details
- Namespace: rh-openshift-gitops-tenant
- PipelineRun: gitops-1-20-on-pull-request-8pnvr
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 52 seconds | |
| 🟢 Succeeded | 28 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 4 minutes | |
| 🟢 Succeeded | 17 seconds | |
| 🟢 Succeeded | 27 seconds | |
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 6 seconds | |
| 🟢 Succeeded | 47 seconds | |
| 🟢 Succeeded | 10 seconds | |
| 🟢 Succeeded | 21 seconds | |
| 🟢 Succeeded | 34 seconds | |
| 🟢 Succeeded | 11 seconds | |
| 🟢 Succeeded | 39 seconds | |
| 🟢 Succeeded | 23 seconds | |
| 🟢 Succeeded | 51 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 13 seconds |
Loading