Skip to content

Completed the elevator assignment #12

Open
NachtMk wants to merge 13 commits intosmatechnologies-engineering:masterfrom
NachtMk:master
Open

Completed the elevator assignment #12
NachtMk wants to merge 13 commits intosmatechnologies-engineering:masterfrom
NachtMk:master

Conversation

@NachtMk
Copy link
Copy Markdown

@NachtMk NachtMk commented Sep 2, 2023

The program has a maintainability score over 70 via a Plato check. Run the build.sh with Linux shell or similar and it should run the npm test, plate report, and npm start. The output file is called elevator.log.json. For the convenient of testing, I made the elevator waiting and stopping time of the elevator to be 100ms and 300ms instead. It can easily be changed in the elevator.request.js

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant