docs: close C09A bounded PREVRANDAO milestone - #69
Draft
tanka420 wants to merge 7 commits into
Draft
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Why
C09A-E4 is merged on
main, but the repository governance documents still describe C09A as planned/pending. E5 closes that documentation drift without changing runtime behavior.Developer impact
19 known / 16 default / 7 wallet / 4 canonicalRecorded implementation evidence
d829278f26669f6190a516cb3c0efed9aca7f49c5d368d7ac0d75a00c9d6dfb65496304040a738f7a4d3a5cb5ea6eb92fd18f84c01e4c2c61ac54903bc0b00b88b295cfaa10f4b976b852229a5ffab8dE4 recorded
corepack pnpm verify:fullpassing, 41 package test files / 2,683 tests passing, 5/5 workflow tests passing, build/lint/package smoke passing, and independent review at 0 blocker / 0 major / 0 minor.E5 validation required before merge
Scope
Documentation/governance only. Exact branch diff contains only C09/C09A plans, E5 closeout evidence, roadmap, and backlog files.