Repository navigation
Phase 1: establish Rev A hardware contract and PCB - #5
Draft
danielbrownjr wants to merge 20 commits into
Draft
danielbrownjr wants to merge 20 commits into
danielbrownjr wants to merge 20 commits into
Conversation
This reverts commit a4def1c. The Panda PWR teardown record belongs in danielbrownjr/DragonPWR, not JumpJet. It moved there in danielbrownjr/DragonPWR#10.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
This draft PR tracks Jump Jet Phase 1 hardware definition and first Rev A PCB implementation.
It is intentionally open before the PCB is complete so schematic corrections, mechanical decisions, footprint work, component selections, layout rationale, and validation evidence can accumulate in one reviewable place.
This PR is not fabrication-ready and does not authorize heater or fan actuation. The production firmware remains cold-safe and heater-incapable.
Current Phase 1 status
Completed / established:
Current important design directions
Heater path
Current topology:
The heater path is sized using the conservative 8.33 A basis until production-intent validation proves otherwise.
ESP32-S3 mounting
Current physical evidence:
Production direction:
ESP32 power
Preferred architecture:
USB-C is retained for service, flashing, recovery, and debug—not normal installed power. USB-only power must not energize gate drive. Mixed-source topology and backfeed behavior remain fabrication blockers.
Fan architecture
The original Rev A.4.1 two-wire low-side-switched fan-power block is obsolete for production. Phase 1 now implements provisional schematic provisions for:
Model-specific manufacturer data confirms 24 V, 21.6–26.4 V operation, 0.27 A, 6.48 W, pulse sensor, and PWM capability for the 9GA0424P3J001. Exact PWM frequency, high-Z/0% behavior, tach output circuit, PPR, startup/minimum duty, RPM/stall behavior, and proof thresholds remain characterization-dependent.
Gate drive
Rev A.4.1 uses SN74AHCT125 buffering with used OE inputs tied low. Required correction remains:
Mechanics status
Current fabrication blockers
Installed Wi-Fi RSSI/range qualification is post-prototype and pre-release; it does not replace the pre-fabrication antenna identity/keepout requirement.
Phase 1 review checklist
Mechanical / footprint
Power / protection
Heater path
Fan
PCB
Safety boundary
Nothing in this PR authorizes heater or fan actuation.
Firmware remains cold-safe until the hardware path, sensing, fan proof, safety interlocks, and physical protections are implemented and validated. Firmware does not replace fusing, independent thermal cutoff, rated wiring/connectors, MOSFET derating, PCB copper/clearance requirements, airflow validation, or temperature-suitable materials.
Source of truth
The hardware register is the living record of confirmed facts, measurements, design decisions, candidates, assumptions, blockers, and validation status.
Merge criteria
Do not merge this PR merely because the first PCB exists. Phase 1 is merge-ready only after the hardware contract is reviewed, critical mappings and safety corrections are resolved, the first PCB is created and reviewed, fabrication blockers are closed or explicitly accepted with evidence, documentation is synchronized, no candidate is silently promoted to BOM-final, and no firmware GPIO/ADC/PWM/RPM/thermal constant is frozen without supporting hardware evidence.