Historical record; policy superseded 2026-09-13. This closed issue records past work, not current execution instructions or production acceptance. The owner requires no CI checks: all code review and validation run locally. Do not recreate the hosted workflows, CI merge gates or hosted reviewer described below. Current work and evidence are tracked in #252, #277-#286, and #191 for native release. Existing closure and historical results do not certify today's workflows or screenshots.
Original historical issue
Autonomous 10h overnight run. Build a committed, CI-blocking Playwright e2e suite, ship workflow-completing features (each with its e2e flow), then backfill e2e for existing flows. Mobile excluded (#191 = JDK blocker). Live monitoring surface — ticked per merge.
Phase A — e2e foundation (FIRST; blocking lane gates the rest)
Phase B — new workflow features (feature → committed e2e → PR)
Phase C — e2e backfill for existing flows (~5 flows/PR)
Cadence: progress comment per merge; rolled-up status per phase / ~5 items; final summary at end.
Original historical issue
Autonomous 10h overnight run. Build a committed, CI-blocking Playwright e2e suite, ship workflow-completing features (each with its e2e flow), then backfill e2e for existing flows. Mobile excluded (#191 = JDK blocker). Live monitoring surface — ticked per merge.
Phase A — e2e foundation (FIRST; blocking lane gates the rest)
Phase B — new workflow features (feature → committed e2e → PR)
Phase C — e2e backfill for existing flows (~5 flows/PR)
Cadence: progress comment per merge; rolled-up status per phase / ~5 items; final summary at end.