Repository navigation
Close delivered pm items and keep in progress for active work only - #178
Conversation
There was a problem hiding this comment.
Your trial has ended. Reactivate Greptile to resume code reviews.
|
Important
This repository does not receive automatic reviews because it has fewer than 10 stars.
|
Reviewer's guide (collapsed on small PRs)Reviewer's GuideThis tracker-only sweep verifies PM items against merged PRs, acceptance evidence, and repository history, closing proven deliveries, reopening incomplete or unsupported work, releasing stale claims, and updating append-only audit records and changelog placement; it does not change production functions. Flow diagram for tracker item closeout reviewflowchart TD
A[In-progress and open PM items] --> B[Inspect tracker records]
B --> C[Verify merged PR and acceptance evidence]
C --> D{Delivery fully proven?}
D -->|Yes| E[Set status to closed]
D -->|No| F{Active work remains?}
F -->|Yes| G[Keep status in_progress]
F -->|No| H[Set status to open]
C --> I[Release stale claims]
E --> J[Append audit history and update changelog]
G --> J
H --> J
I --> J
File-Level Changes
Tips and commandsInteracting with Sourcery
Customizing Your ExperienceAccess your dashboard to:
Getting Help
|
The in-progress sweep closed delivered items with completed_at set to the reconciliation time. Analytics that read completed_at as the delivery time (cycle time, recall utility, burndown) then see work finish up to weeks late. Each closure now carries the cited PR's merge time as completed_at; closed_at keeps the tracker reconciliation time. Recorded with pm update --completed-at, so the correction is an appended history event.
There was a problem hiding this comment.
Your trial has ended. Reactivate Greptile to resume code reviews.
|
Orchestrator review of this sweep (done by hand; review bots here are rate-limited or not enabled):
Merging once CI is green on this head. |
Close verified deliveries and keep in progress reserved for active work. Every original in-progress and open item was checked against full tracker records and merged/open PR claims, comments and acceptance criteria. Incomplete or ambiguous work remains open. Current stale assignments are released; historical claim identities remain provenance.
Blocked by the pinned SDK; owner compatibility decision pending:
pm-github-f1ev(in_progress): Verified delivered, but the repository-pinned SDK refuses all mutations with project_runtime_item_format_incompatible: existing linked-test update metadata requires format 2 while the consumer floor remains 2026.10.5. The prepared 2026.10.10 peer/manifest minimum change awaits owner approval; no safeguard or evidence was removed.pm-github-2o9k(in_progress): Verified delivered, but the repository-pinned SDK refuses all mutations with project_runtime_item_format_incompatible: existing linked-test update metadata requires format 2 while the consumer floor remains 2026.10.5. The prepared 2026.10.10 peer/manifest minimum change awaits owner approval; no safeguard or evidence was removed.Retained open after review:
pm-github-4a03: No implementing merged PR establishes full delivery of the recorded scope.pm-github-4cuz: No implementing merged PR establishes full delivery of the recorded scope.pm-github-vhi6: PR 174 raises the c8 heap allowance and reduces fixtures, but explicitly leaves bounded coverage aggregation unfinished; no active work.Validation: package changelog generation/check, pinned strict tracker health with required merge drivers under isolated Git identity, changed-item history verification, independent original-history prefix checks, linked
git diff --check, and public added-text/scope checks passed. Existing history records are unchanged. No production function changed, so source-function revert proof is inapplicable; mainline ancestry, acceptance and lifecycle/history checks provide the evidence.Where strict health required it, the repository-pinned
pm merge installregenerated the extension merge fence. Existing historical advisories are retained; no history normalization or repair was used. The pm-vcs text self-host archive is regenerated and independently checked when applicable.The PR CI runs complete
npm run release:checkandbun run release:check(nativejust release-checkfor Rust). Final exact-head CI results are reported separately; pending, skipped and neutral review checks are not approval.Commit:
ae4f8f3b82e1141b720b7fb5fd42e48124b3831e. The sweep audit remains open with its claim released for orchestrator review. No PR is merged.Summary by Sourcery
Reconcile project-management records so delivered work is closed, active work remains in progress, and incomplete or blocked items stay open for follow-up.
Enhancements:
CI:
Chores: