You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The active host-zone-gateway-isolation VM check is deferred from vmChecks during U20. Its Gateway Guest reaches CH child creation, but Process-watch controller-session/fencing callbacks still perform effect completion work in the Resource commit path. This can hold CommitBatch and prevent the Gateway VMM from progressing.
The fixture is retained at tests/host-integration/deferred/host-zone-gateway-isolation.nix.
Resource watch callbacks only enqueue affected owners and return immediately.
Process/session/StoreSync effects persist completion evidence and request reconciliation rather than blocking a reconciler or store commit.
Gateway Guest reaches Ready without startup retry loops or polling-driven progress.
ZoneLink/uplink reaches its expected state while relay credentials remain exclusively inside Guest/gateway.
The fixture has bounded phase-specific waits and terminal fast-fail diagnostics.
Restore the fixture to tests/host-integration/host-zone-gateway-isolation.nix and include it in full make test-host-integration acceptance.
Amendment (2026-09-21): acceptance criteria re-scoped to what today's reconciler can test
The 2026-09-13 status note stands, and this amendment records its consequence: the durable-requeue half of the #489 contract was deleted with the store cutover, so the criteria above overstate what the current reconciler can satisfy. The fixture is deferred by construction - tests/host-integration/deferred/ is the designated holding state for checks that cannot pass yet - rather than by unmet criteria alone. Verified in the tree on 2026-09-21: the fixture still sits at tests/host-integration/deferred/host-zone-gateway-isolation.nix while the twelve top-level fixtures in tests/host-integration/ are the active vmChecks set.
Re-scoping:
The criteria that name controller: standardize single-write reconcile and durable requeue semantics #489's durable requeue/message semantics (first and third bullets) must be re-expressed against what the store and controller actually provide today - single-write reconcile and the requeue timers of the v3 ractor resource runtime - or dropped from this issue and tracked separately. They cannot be met as written because the contract half they reference no longer exists.
The remaining criteria are testable against the current fixture and should be validated first: watch callbacks enqueue affected owners and return immediately; Gateway Guest reaches Ready without startup retry loops or polling-driven progress; ZoneLink/uplink reaches its expected state with relay credentials exclusively inside Guest/gateway; bounded phase-specific waits with terminal fast-fail diagnostics.
A move back to tests/host-integration/host-zone-gateway-isolation.nix (and inclusion in full make test-host-integration acceptance) is valid once the re-expressed criteria pass on a host; nothing else gates the move.
Owners: zonelink/ZoneLink controller and the host-integration lane.
Context
The active
host-zone-gateway-isolationVM check is deferred fromvmChecksduring U20. Its Gateway Guest reaches CH child creation, but Process-watch controller-session/fencing callbacks still perform effect completion work in the Resource commit path. This can hold CommitBatch and prevent the Gateway VMM from progressing.The fixture is retained at
tests/host-integration/deferred/host-zone-gateway-isolation.nix.Re-enable criteria
Guest/gateway.tests/host-integration/host-zone-gateway-isolation.nixand include it in fullmake test-host-integrationacceptance.Amendment (2026-09-21): acceptance criteria re-scoped to what today's reconciler can test
The 2026-09-13 status note stands, and this amendment records its consequence: the durable-requeue half of the #489 contract was deleted with the store cutover, so the criteria above overstate what the current reconciler can satisfy. The fixture is deferred by construction -
tests/host-integration/deferred/is the designated holding state for checks that cannot pass yet - rather than by unmet criteria alone. Verified in the tree on 2026-09-21: the fixture still sits attests/host-integration/deferred/host-zone-gateway-isolation.nixwhile the twelve top-level fixtures intests/host-integration/are the activevmChecksset.Re-scoping:
Guest/gateway; bounded phase-specific waits with terminal fast-fail diagnostics.tests/host-integration/host-zone-gateway-isolation.nix(and inclusion in fullmake test-host-integrationacceptance) is valid once the re-expressed criteria pass on a host; nothing else gates the move.Owners: zonelink/ZoneLink controller and the host-integration lane.