Skip to content

Close lmux M3/M4 acceptance and final review #607

Description

@zhnt

Objective

Close the remaining lmux M3/M4 acceptance gates for the managed Linux workspace service already merged through PRs #601 and #602.

Scope

  • reproduce and resolve the managed-product-history-restore startup failure without relaxing lifecycle or evidence checks;
  • run a fresh uninterrupted formal A/A campaign for managed-product-first-use under the accepted ARD-004 comparison contract;
  • confirm the retained managed-mux and long-history warm evidence by read-only source-bound reevaluation;
  • run the documented installed, disconnect/reconnect, exact-stop, cleanup, and performance gates;
  • perform final architecture, lifecycle/security, and Product/test review of the delivered goal;
  • update lmux status documents to distinguish accepted evidence from diagnostic-only records.

Non-goals

  • no new lmux capability or protocol;
  • no threshold relaxation, sample filtering, or report rewriting;
  • no remote/SSH feature expansion beyond the documented local PTY acceptance scope;
  • no unrelated PLC or TUI redesign.

Exit criteria

  • every required formal campaign is complete, valid, source-bound, and settled, or the contract records an independently reviewed product defect with a narrow fix and rerun;
  • required static and regression gates pass;
  • no unresolved P0/P1/P2 finding remains in the final three-perspective review;
  • the architecture status accurately states what is and is not accepted.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions