current main: e468c6c035c3c35e12a0c1d7795d76d5306045eb
open implementation PRs: none
active assignee WIP for Qy: none
Both direct dependencies in the Issue contract are merged and audited. Issue #30 is released from status:blocked / Project Blocked to status:ready / Project Ready.
This gate releases planning and claim only. It is not scope confirmation, implementation authorization, QA PASS, merge permission, or evidence that any Alignment result is correct.
No branch or worktree exists yet. The next object is a closed-path Work Plan followed by explicit SINGLE_OPERATOR_SCOPE_REVIEW and SCOPE_CONFIRMED / IMPLEMENTATION_AUTHORIZED. No independent reviewer will be claimed.
This plan follows the frozen batch order and the single-operator workflow. No implementation branch or worktree will exist until this plan is published and self-reviewed.
Source hierarchy and resolved contract
The implementation will follow, in order: the issue body and acceptance criteria, ADRs 0003/0004, the engineering plan, the issue backlog, repository package/CI conventions, and the pinned Moss contracts established by #27/#28. The following resolutions make the issue implementable without widening report schema ownership:
preflight-core returns the existing strict @moss-mini-demo/report-schemaAlignment shape. It will not add expected/observed/prose fields to Alignment, alter DecisionInput, or compute a final Decision.
Expected and observed values live in a transient, strict, typed AlignmentInputV0_1. Its first five fields are report-source-compatible roots (intent, quotes, selection, capability, simulation); a closed observations map links typed facts back to those roots with JSON Pointer source references. The observations are evaluator inputs, not report output fields.
A typed observation is trusted only when its source reference is syntactically canonical, resolves in the validated source roots, is relevant for that check under a closed allowlist, and the resolved raw value exactly equals the typed value. Caller-supplied values alone never establish PASS.
Structured Intent supplies policy wherever the public schema carries it. The evaluator uses fixed v0.1 semantics for the remaining non-prose policy: omitted recipient means the Intent account; approvals must be absent or explicitly proven necessary, bounded by inputAmount, and never unbounded; warning-free means an empty proven warning set; receipt/coverage/ordering/state-continuity PASS requires an explicit proven state.
When a valid input explicitly lacks/unproves evidence, or a fact has an invalid, unresolved, value-mismatched, or check-irrelevant reference, that check is REVIEW, never PASS. A proven business mismatch is FAIL; only a proven match is PASS.
Invalid references are never copied into output. The affected REVIEW check receives deterministic, resolving fallback references to the relevant source artifact/availability field, preserving report-schema validity while remaining fail-closed.
Public API
Create package @moss-mini-demo/preflight-core with an ESM public entry exposing:
runtime: evaluateAlignmentV0_1(input: unknown): Alignment and AlignmentInputErrorV0_1;
type-only: AlignmentInputV0_1, AlignmentObservationV0_1, AlignmentCheckIdV0_1, and supporting closed fact/status types needed by M2-10;
no runtime import of moss-adapter, no network/filesystem/time/randomness, and no public helper that bypasses input validation.
AlignmentInputErrorV0_1 will use stable machine-readable codes for malformed/non-JSON/unsupported contract input. Contract-invalid hostile input throws before evaluation; valid explicit evidence gaps produce REVIEW checks.
Fixed check set and semantics
The evaluator emits exactly these checks, in this order, with stable *-v0-1 check IDs and critical: true:
operation equality between selected/requested raw operation and capability operation;
account equality to intent.account;
input asset equality to intent.inputAsset;
output asset equality to intent.outputAsset;
input amount equality to intent.inputAmount;
observed slippage at or below intent.maxSlippageBps;
selected/used protocol membership in intent.allowedProtocols;
recipient equality to intent.recipient ?? intent.account;
approval spender is absent/not-applicable or explicitly expected and equal;
approval amount is absent/not-applicable or positive, bounded by intent.inputAmount, and not unbounded;
observed funds movements are a subset of the raw-linked permitted movement set;
capability integrity is explicitly proven matching;
observed transaction target/role set exactly matches the raw-linked expected set;
warning set is explicitly available and empty;
required receipt set is explicitly available and complete;
simulation coverage is explicitly proven complete;
transaction ordering is explicitly proven preserved;
state continuity is explicitly proven preserved, or raw-proven not applicable for a single transaction.
Addresses use the public canonical EIP-55 20-byte address schema. Assets use the public Asset schema. Amounts remain canonical integer strings and are compared with BigInt; numbers are never used for asset amounts. Collections reject duplicates and are compared with deterministic canonical keys, without mutating caller input.
Source-reference boundary
src/source-references.ts will implement a pure RFC 6901 resolver and a closed per-check relevance table. It will:
allow only /intent, /quotes/<index>/raw, /selection, /capability/raw, /simulation/raw, and the public artifact availability fields needed to prove absence/unavailability;
require observed semantic facts to point into raw-backed evidence or explicit availability fields, while Intent references may establish expected policy;
validate output references again against the source roots before returning Alignment;
Before any schema parsing or reference resolution, the input graph will be descriptor-closed JSON-validated: no accessors, proxies with observable traps, symbols, functions, cycles/shared references, sparse arrays, non-finite numbers, negative zero, invalid Unicode/lone surrogates, or prototype pollution surface. Evaluation operates on validated fresh data and does not freeze or mutate caller-owned objects.
Any need to edit report-schema, decision-engine, moss-adapter, web, workflows, governance, ADRs, or any other path is scope drift and requires stopping for a revised Work Plan.
Package and gate integration
Add the private ESM workspace package with a build entry matching existing package conventions.
Depend on @moss-mini-demo/report-schema through the workspace protocol and zod only if required for closed input composition; do not depend on or runtime-load server-only Moss adapter code.
Add exact root dev dependency @vitest/coverage-v8@4.1.10, matching the pinned Vitest version, and update the lockfile only through pnpm.
Add test:coverage for preflight-core with v8 and 100% statements/branches/functions/lines over its runtime source.
Add preflight-core to root build, clean typecheck preparation, package-import smoke, and test ordering.
Include pnpm test:coverage in pnpm check so the protected quality-gate enforces the coverage contract. No workflow or branch-protection change is planned.
Test matrix
Tests will be table-driven over all 18 stable check IDs. Every check receives at least:
proven PASS evidence;
proven FAIL evidence;
missing/unproven evidence -> REVIEW;
invalid/unresolved/value-mismatched reference -> REVIEW with valid fallback refs;
valid but irrelevant evidence reference -> REVIEW with valid fallback refs.
Additional focused coverage will include:
canonical address and asset comparisons, mixed-case/noncanonical rejection;
integer-string and BigInt boundary cases, zero/negative/decimal/exponent/unsafe-number rejection, bounded versus max/unbounded approval;
optional recipient fallback, approval and continuity not-applicable proofs;
duplicate/reordered protocol, transaction, movement, warning, receipt, and reference sets;
pointer escaping/index boundaries and rejection of self/later/report-owned paths;
No Clear402, browser, UI, vendor, network, or deployment work.
No guessed Moss private internals: observations must be supplied from structured/raw evidence and proven by resolver equality.
Stop and revise this plan if an acceptance requirement cannot be met within the 11 authorized paths, if public report schemas must change, if the dependency/lock delta exceeds the declared coverage tool and workspace package, or if any direct dependency/audit/protection condition regresses.
Reviewed the published plan byte-for-byte at SHA-256 0abf8e133a272f4dfd997994c1c1cbc6fb2e6e6a7b9c2df271b57e48de87d7f3 against the issue acceptance criteria, ADRs 0003/0004, the engineering plan, current public schemas, #27/#28 contracts, package conventions, CI, and protected-branch policy.
Trust boundary: PASS. PASS requires structured typed facts whose allowed source references resolve and whose values equal raw/public source values. Missing, invalid, irrelevant, unresolved, or mismatched provenance is fail-closed REVIEW. Prose is absent from the contract.
All required checks: PASS. The plan fixes all 18 required checks, stable IDs/order, critical: true, and PASS/FAIL/REVIEW semantics without producing a Decision.
Schema ownership: PASS. Existing strict Alignment remains the only output. No report-schema, DecisionInput, decision-engine, adapter, report top-level, or workflow edit is authorized.
Data correctness: PASS. EIP-55 addresses, Asset schemas, canonical integer strings/BigInt, duplicate rejection, immutable/fresh output, and deterministic ordering are explicit.
Source references: PASS. Canonical RFC 6901 resolution, raw/availability owner allowlists, no self/later/report-owned references, value equality, output revalidation, and safe fallback references cover invalid and irrelevant evidence without emitting invalid Alignment.
Hostile input: PASS. Descriptor-closed JSON validation and structured input errors cover the mandatory hostile graph classes before evaluation; explicit evidence absence remains a normal REVIEW path.
Tests/coverage: PASS. The plan requires the five-case matrix for every one of 18 checks, boundary/hostile/determinism/immutability/public-entry tests, 100% v8 package coverage, focused tests, pnpm test:coverage, and full pnpm check in implementation and clean QA.
Dependencies/lock: PASS. The only external dependency delta is exact @vitest/coverage-v8@4.1.10, matched to existing Vitest; the workspace package uses existing report-schema/zod contracts. Lock changes are declared and auditable.
Scope: PASS. Eleven writable paths are closed and sufficient. Anything else triggers a revised plan before editing.
Merge safety: PASS. Exact-head CI, clean single-operator QA, readiness, protected squash merge, merged-main gate, tree equivalence, post-merge audit, closure, and cleanup are explicit.
No ambiguity or missing prerequisite requires a plan revision. The published hash is accepted as the implementation contract.
Next authorized state: create the sole branch codex/issue-30-deterministic-alignment and isolated worktree /Users/qy/Documents/moss-mini-demo-issue-30 from the recorded protected-main baseline.
Worktree is clean at the frozen commit. This is an implementation report only; it is not an independent-review or QA claim.
Delivered contract
Added private ESM package @moss-mini-demo/preflight-core with public runtime exports evaluateAlignmentV0_1 and AlignmentInputErrorV0_1; all supporting types are type-only.
Evaluator emits exactly the fixed 18 *-v0-1 Alignment checks in deterministic order, all critical: true, and only PASS/FAIL/REVIEW. It never builds a final Decision and does not alter report-schema or DecisionInput.
Added strict transient typed observations for operation, account/assets/amount/slippage/protocol/recipient, approval spender/amount, permitted/observed movement sets, capability integrity, transaction targets, warnings, receipts, coverage, ordering, and state continuity.
AVAILABLE facts require exact equality between the typed value and a resolving, canonical, check-relevant raw pointer. Missing/failed/unprovable, invalid/unresolved, value-mismatched, and same-owner/cross-owner irrelevant evidence all fail closed to REVIEW with deterministic valid fallback references.
Added descriptor-closed graph validation for accessors, proxies, cycles/shared references, sparse arrays, symbols/functions, prototype-related keys, lone surrogates, non-finite/-0 values, and malformed descriptors. Evaluation is synchronous, pure, offline, deterministic, fresh-output, and non-mutating.
Enforced canonical EIP-55 addresses/assets, integer-string amounts with BigInt comparison, duplicate-free semantic sets, bounded/non-unbounded approvals, and public simulation evidence consistency.
Added package build/typecheck/import/test ordering and root test:coverage; pinned @vitest/coverage-v8@4.1.10 and updated the lockfile through pnpm. pnpm check now enforces 100% preflight-core v8 statements/branches/functions/lines.
Implementation verification
All commands below passed on Node 22.23.1 / pnpm 11.16.0 at the frozen commit:
pnpm check: 29 test files, 1056 tests passed; all package builds/typechecks/import smokes, browser bundle leakage (9 artifacts), and production health smoke passed.
pnpm audit --prod matches the protected-main baseline exactly: 6 pre-existing advisories (2 moderate, 4 high) under apps/web (sharp, postcss, nanoid); no new production dependency vulnerability was introduced.
Secret scan found no credentials or key material; the only keyword hit is an intentional hostile-input test property named secret.
Scope audit
The frozen commit changes exactly the 11 paths authorized by the reviewed Work Plan: root package.json, pnpm-lock.yaml, and the nine packages/preflight-core package/source/test files. No report-schema, decision-engine, moss-adapter, web, workflow, governance, ADR, vendor, or generated coverage/dist/node_modules path changed.
Next state is the required clean single-operator QA handoff at this exact frozen HEAD.
QA environment was created directly from the frozen head with no node_modules, dist, coverage, or .next artifacts.
QA will use Node 22.23.1 / pnpm 11.16.0, perform a frozen install, inspect the complete base-to-head diff and exact 11-path scope, reproduce raw-reference/hostile-input/high-risk boundaries, run focused 18-check matrices and 100% coverage, then run full pnpm check. Any code change or head movement invalidates this handoff and returns the issue to IMPLEMENT.
Transparent setup correction: the first standalone preflight-core build was attempted before its workspace dependency report-schema had a clean-worktree dist, so TypeScript could not resolve the public package. As with the established workspace package convention, QA built @moss-mini-demo/report-schema first and then repeated the exact focused commands successfully. No source change or QA finding resulted. To verify the authoritative root workflow, QA then removed both generated dist directories and coverage and ran root pnpm check from no-dist state; it passed and established the dependency order itself.
The five required outcomes were exercised for each of all 18 checks: PASS, FAIL, explicit missing/REVIEW, invalid/unresolved ref/REVIEW, and irrelevant ref/REVIEW. Irrelevance was tested both across owners and within the correct raw owner using a wrong semantic field.
Hostile descriptor graph, canonical pointer, EIP-55/Asset, integer-string/BigInt, approval bounds, set/order, optional recipient, public simulation consistency, purity/freshness, no clock/random/network, and public-entry cases passed.
Activity
pillowtalk-Qy commentedon Aug 8, 2026
DEPENDENCY_GATE / PASS
Dependency evidence:
e468c6c035c3c35e12a0c1d7795d76d5306045eb; merged-mainquality-gatesuccess https://github.com/Moss-Mini-Demo/moss-mini-demo/actions/runs/31235869098; post-merge audit M2-07: Implement simulation and lossless evidence mapping #28 (comment)e468c6c035c3c35e12a0c1d7795d76d5306045ebBoth direct dependencies in the Issue contract are merged and audited. Issue #30 is released from
status:blocked/ Project Blocked tostatus:ready/ Project Ready.This gate releases planning and claim only. It is not scope confirmation, implementation authorization, QA PASS, merge permission, or evidence that any Alignment result is correct.
DEPENDENCY_GATE_PASS / READY_FOR_CLAIMpillowtalk-Qy commentedon Aug 8, 2026
BUILDER CLAIM / SINGLE OPERATOR
Qy claims Issue #30 as the sole implementation controller.
e468c6c035c3c35e12a0c1d7795d76d5306045ebNo branch or worktree exists yet. The next object is a closed-path Work Plan followed by explicit
SINGLE_OPERATOR_SCOPE_REVIEWandSCOPE_CONFIRMED / IMPLEMENTATION_AUTHORIZED. No independent reviewer will be claimed.BUILDER_CLAIMED / PLANNING_IN_PROGRESSpillowtalk-Qy commentedon Aug 8, 2026
Work Plan - M2-09 deterministic preflight alignment
Baseline and dependency gate
Moss-Mini-Demo/moss-mini-demo#30.mainate468c6c035c3c35e12a0c1d7795d76d5306045eb.Done, and post-merge audited: M1-03: Implement fail-closed decision engine #6 and M2-07: Implement simulation and lossless evidence mapping #28.Source hierarchy and resolved contract
The implementation will follow, in order: the issue body and acceptance criteria, ADRs 0003/0004, the engineering plan, the issue backlog, repository package/CI conventions, and the pinned Moss contracts established by #27/#28. The following resolutions make the issue implementable without widening report schema ownership:
preflight-corereturns the existing strict@moss-mini-demo/report-schemaAlignmentshape. It will not add expected/observed/prose fields toAlignment, alterDecisionInput, or compute a finalDecision.AlignmentInputV0_1. Its first five fields are report-source-compatible roots (intent,quotes,selection,capability,simulation); a closedobservationsmap links typed facts back to those roots with JSON Pointer source references. The observations are evaluator inputs, not report output fields.inputAmount, and never unbounded; warning-free means an empty proven warning set; receipt/coverage/ordering/state-continuity PASS requires an explicit proven state.REVIEW, neverPASS. A proven business mismatch isFAIL; only a proven match isPASS.Public API
Create package
@moss-mini-demo/preflight-corewith an ESM public entry exposing:evaluateAlignmentV0_1(input: unknown): AlignmentandAlignmentInputErrorV0_1;AlignmentInputV0_1,AlignmentObservationV0_1,AlignmentCheckIdV0_1, and supporting closed fact/status types needed by M2-10;moss-adapter, no network/filesystem/time/randomness, and no public helper that bypasses input validation.AlignmentInputErrorV0_1will use stable machine-readable codes for malformed/non-JSON/unsupported contract input. Contract-invalid hostile input throws before evaluation; valid explicit evidence gaps produce REVIEW checks.Fixed check set and semantics
The evaluator emits exactly these checks, in this order, with stable
*-v0-1check IDs andcritical: true:intent.account;intent.inputAsset;intent.outputAsset;intent.inputAmount;intent.maxSlippageBps;intent.allowedProtocols;intent.recipient ?? intent.account;intent.inputAmount, and not unbounded;Addresses use the public canonical EIP-55 20-byte address schema. Assets use the public Asset schema. Amounts remain canonical integer strings and are compared with
BigInt; numbers are never used for asset amounts. Collections reject duplicates and are compared with deterministic canonical keys, without mutating caller input.Source-reference boundary
src/source-references.tswill implement a pure RFC 6901 resolver and a closed per-check relevance table. It will:/intent,/quotes/<index>/raw,/selection,/capability/raw,/simulation/raw, and the public artifact availability fields needed to prove absence/unavailability;Before any schema parsing or reference resolution, the input graph will be descriptor-closed JSON-validated: no accessors, proxies with observable traps, symbols, functions, cycles/shared references, sparse arrays, non-finite numbers, negative zero, invalid Unicode/lone surrogates, or prototype pollution surface. Evaluation operates on validated fresh data and does not freeze or mutate caller-owned objects.
Exact writable paths
Implementation is authorized only in these paths:
package.jsonpnpm-lock.yamlpackages/preflight-core/package.jsonpackages/preflight-core/tsconfig.build.jsonpackages/preflight-core/src/alignment.tspackages/preflight-core/src/source-references.tspackages/preflight-core/src/index.tspackages/preflight-core/test/synthetic.tspackages/preflight-core/test/alignment.test.tspackages/preflight-core/test/source-references.test.tspackages/preflight-core/test/public-entry.smoke.mjsAny need to edit report-schema, decision-engine, moss-adapter, web, workflows, governance, ADRs, or any other path is scope drift and requires stopping for a revised Work Plan.
Package and gate integration
@moss-mini-demo/report-schemathrough the workspace protocol andzodonly if required for closed input composition; do not depend on or runtime-loadserver-onlyMoss adapter code.@vitest/coverage-v8@4.1.10, matching the pinned Vitest version, and update the lockfile only through pnpm.test:coveragefor preflight-core with v8 and 100% statements/branches/functions/lines over its runtime source.pnpm test:coverageinpnpm checkso the protectedquality-gateenforces the coverage contract. No workflow or branch-protection change is planned.Test matrix
Tests will be table-driven over all 18 stable check IDs. Every check receives at least:
Additional focused coverage will include:
Verification sequence
On the isolated implementation worktree and frozen HEAD:
pnpm --filter @moss-mini-demo/preflight-core buildpnpm test:coveragepnpm checkquality-gate, explicitSINGLE_OPERATOR_QA_PASS,READY_TO_MERGE, protected squash merge, merged-mainquality-gate, tree-equivalence audit, issue/project closure, and branch/worktree cleanup.Explicit non-goals and stop conditions
pillowtalk-Qy commentedon Aug 8, 2026
Work Plan self-review - PASS
Reviewed the published plan byte-for-byte at SHA-256
0abf8e133a272f4dfd997994c1c1cbc6fb2e6e6a7b9c2df271b57e48de87d7f3against the issue acceptance criteria, ADRs 0003/0004, the engineering plan, current public schemas, #27/#28 contracts, package conventions, CI, and protected-branch policy.critical: true, and PASS/FAIL/REVIEW semantics without producing a Decision.Alignmentremains the only output. No report-schema, DecisionInput, decision-engine, adapter, report top-level, or workflow edit is authorized.pnpm test:coverage, and fullpnpm checkin implementation and clean QA.@vitest/coverage-v8@4.1.10, matched to existing Vitest; the workspace package uses existing report-schema/zod contracts. Lock changes are declared and auditable.No ambiguity or missing prerequisite requires a plan revision. The published hash is accepted as the implementation contract.
Next authorized state: create the sole branch
codex/issue-30-deterministic-alignmentand isolated worktree/Users/qy/Documents/moss-mini-demo-issue-30from the recorded protected-main baseline.pillowtalk-Qy commentedon Aug 8, 2026
Implementation Report - M2-09 deterministic preflight alignment
Frozen implementation
M2-09: Implement deterministic preflight alignment.maine468c6c035c3c35e12a0c1d7795d76d5306045eb.codex/issue-30-deterministic-alignment./Users/qy/Documents/moss-mini-demo-issue-30.263f7cfb30d54bf21482a1779335fba466188817.Delivered contract
@moss-mini-demo/preflight-corewith public runtime exportsevaluateAlignmentV0_1andAlignmentInputErrorV0_1; all supporting types are type-only.*-v0-1Alignment checks in deterministic order, allcritical: true, and onlyPASS/FAIL/REVIEW. It never builds a final Decision and does not alter report-schema or DecisionInput.REVIEWwith deterministic valid fallback references.test:coverage; pinned@vitest/coverage-v8@4.1.10and updated the lockfile through pnpm.pnpm checknow enforces 100% preflight-core v8 statements/branches/functions/lines.Implementation verification
All commands below passed on Node
22.23.1/ pnpm11.16.0at the frozen commit:pnpm --filter @moss-mini-demo/preflight-core buildvitestalignment/source-reference suite: 167 passedpnpm test:coverage: 100% statements, branches, functions, linespnpm check: 29 test files, 1056 tests passed; all package builds/typechecks/import smokes, browser bundle leakage (9 artifacts), and production health smoke passed.pnpm audit --prodmatches the protected-main baseline exactly: 6 pre-existing advisories (2 moderate, 4 high) underapps/web(sharp,postcss,nanoid); no new production dependency vulnerability was introduced.secret.Scope audit
The frozen commit changes exactly the 11 paths authorized by the reviewed Work Plan: root
package.json,pnpm-lock.yaml, and the ninepackages/preflight-corepackage/source/test files. No report-schema, decision-engine, moss-adapter, web, workflow, governance, ADR, vendor, or generated coverage/dist/node_modules path changed.Next state is the required clean single-operator QA handoff at this exact frozen HEAD.
pillowtalk-Qy commentedon Aug 8, 2026
SINGLE_OPERATOR_QA_HANDOFF
This is a same-operator QA handoff, not an independent reviewer claim.
263f7cfb30d54bf21482a1779335fba466188817e468c6c035c3c35e12a0c1d7795d76d5306045eb/Users/qy/Documents/moss-mini-demo-issue-30/Users/qy/Documents/moss-mini-demo-issue-30-qanode_modules,dist,coverage, or.nextartifacts.QA will use Node 22.23.1 / pnpm 11.16.0, perform a frozen install, inspect the complete base-to-head diff and exact 11-path scope, reproduce raw-reference/hostile-input/high-risk boundaries, run focused 18-check matrices and 100% coverage, then run full
pnpm check. Any code change or head movement invalidates this handoff and returns the issue to IMPLEMENT.pillowtalk-Qy commentedon Aug 8, 2026
SINGLE_OPERATOR_QA_PASS
This is same-operator QA performed in a separate clean environment; no independent second reviewer is claimed.
Accepted head
e468c6c035c3c35e12a0c1d7795d76d5306045eb263f7cfb30d54bf21482a1779335fba466188817successat the accepted head.Clean QA environment
/Users/qy/Documents/moss-mini-demo-issue-30-qa.pnpm install --frozen-lockfilepassed on Node 22.23.1 / pnpm 11.16.0; lockfile supply-chain policy passed.preflight-corebuild was attempted before its workspace dependencyreport-schemahad a clean-worktreedist, so TypeScript could not resolve the public package. As with the established workspace package convention, QA built@moss-mini-demo/report-schemafirst and then repeated the exact focused commands successfully. No source change or QA finding resulted. To verify the authoritative root workflow, QA then removed both generated dist directories and coverage and ran rootpnpm checkfrom no-dist state; it passed and established the dependency order itself.QA evidence
pnpm test:coverage: 100% statements (393/393), branches (435/435), functions (72/72), lines (385/385).pnpm check: format/lint/typecheck/build/import passed; 29 test files / 1,056 tests passed; browser bundle leakage passed for 9 artifacts; production health passed.pnpm audit --prodis identical to protected-main baseline: the same 6 pre-existingapps/webadvisories and no new production vulnerability from M2-09: Implement deterministic preflight alignment #30.secretmatched.QA conclusion
PASS. The accepted head satisfies the reviewed Work Plan and issue acceptance criteria. Any head movement or source change invalidates this pass.
pillowtalk-Qy commentedon Aug 8, 2026
READY_TO_MERGE
PR #76 is ready to leave Draft at accepted head
263f7cfb30d54bf21482a1779335fba466188817.SINGLE_OPERATOR_QA_PASS: published from a separate clean detached worktree; no independent reviewer claim.quality-gate: success (run 31237915579 / job 93053817596).e468c6c035c3c35e12a0c1d7795d76d5306045eb->263f7cfb30d54bf21482a1779335fba466188817.quality-gate, conversation resolution, linear history, admin enforcement; approvals required 0; force pushes/deletions disabled.Authorized next action: mark PR #76 Ready and perform a protected squash merge only if these conditions remain unchanged.
M2-09: implement deterministic preflight alignment (#76)
pillowtalk-Qy commentedon Aug 8, 2026
POST_MERGE_AUDIT - PASS
88cc27b5464fa8725e31f0ea450620f70fe48c40.263f7cfb30d54bf21482a1779335fba466188817.e468c6c035c3c35e12a0c1d7795d76d5306045eb.8e027325d8318d86484d2064a6f0aa4721b741c2.mainare synchronized; remote implementation branch is deleted.All #30 gates have passed. Move the Project item to Done, close the Issue as completed, and clean the local implementation/QA environments.