You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
M5-07: Production deployment, health check and release runbook #56
Frozen SHA acc7a00b2e8f626ddc3f3c7276e2ed4c88e4f468 passed clean QA, zero-vulnerability production audit, local E2E 9/9, and Vercel preview E2E 9/9. PR #106 is in exact-head CI.
PASS. PR #106 merged as 6f8dfabb9f55d864d4a3ae3b15dd1986a0a6435a; merged-main CI 31293332489 succeeded. Production deployment is ready, https://antesig.vercel.app points to it, health reports Node 22.23.1 without sensitive data, and public E2E passed 9/9.
Activity
pillowtalk-Qy commentedon Aug 9, 2026
Started after #55 merged-main CI passed. Finalizing the existing Vercel deployment contract and release runbook.
pillowtalk-Qy commentedon Aug 9, 2026
Frozen SHA
acc7a00b2e8f626ddc3f3c7276e2ed4c88e4f468passed clean QA, zero-vulnerability production audit, local E2E 9/9, and Vercel preview E2E 9/9. PR #106 is in exact-head CI.M5-07: harden production release operations (#106)
pillowtalk-Qy commentedon Aug 9, 2026
PASS. PR #106 merged as
6f8dfabb9f55d864d4a3ae3b15dd1986a0a6435a; merged-main CI 31293332489 succeeded. Production deployment is ready,https://antesig.vercel.apppoints to it, health reports Node 22.23.1 without sensitive data, and public E2E passed 9/9.