You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Type: Parent Tracker
Priority: P0
Initial status: Tracker 可创建;final execution blocked by RC
Owner: Product/Ops + Maintainer
Children: M6-01 through M6-04
Depends on: none to create; final closure depends on RC and all children
Writable: GitHub Tracker only
[ ] M6-01 script/Q&A approved
[ ] M6-02 rehearsals pass
[ ] M6-03 submission/media audited
[ ] M6-04 final Go and confirmation
[ ] all claims point to RC
Codex 指令
只读汇总 M6 artifacts、owner、deadline、可访问性和缺口。
不要提交 event form,不替 Maintainer final Go。
The tracker is visible in Backlog. Final demo and submission claims must be derived from the verified RC (#59); creation of these Issues does not authorize early finalization or submission.
M6 checkpoint: Project is now In Progress. #61 automated draft is complete in Draft PR #113 at exact head c5de544; clean SINGLE_OPERATOR_QA, public 9/9 smoke, and exact-head CI run 31304915072 pass. It remains correctly Blocked because Maintainer-only #59 has no RC tag and real timing/product/technical/security review has not occurred. #62 requires real human rehearsals; #63 requires playable videos, final screenshots/links, event fields, and submission confirmation; #64 is Maintainer final Go/No-Go. No external or human evidence is being synthesized.
M5 is closed and RC hackathon-rc-2026-08-05 is immutable at 34f64df97c510a82a700c7b18bf0c0e0009a0aa2. M6-01 is automated-QA complete in Draft PR #113 with a fixed 3:00 script; M6-02 was synchronized to <=3:00 and now needs real presenter timing/review evidence before merge and downstream media/submission.
Activity
pillowtalk-Qy commentedon Jul 29, 2026
Child mapping - 2026-07-29
The tracker is visible in Backlog. Final demo and submission claims must be derived from the verified RC (#59); creation of these Issues does not authorize early finalization or submission.
pillowtalk-Qy commentedon Aug 9, 2026
M6 checkpoint: Project is now In Progress. #61 automated draft is complete in Draft PR #113 at exact head c5de544; clean SINGLE_OPERATOR_QA, public 9/9 smoke, and exact-head CI run 31304915072 pass. It remains correctly Blocked because Maintainer-only #59 has no RC tag and real timing/product/technical/security review has not occurred. #62 requires real human rehearsals; #63 requires playable videos, final screenshots/links, event fields, and submission confirmation; #64 is Maintainer final Go/No-Go. No external or human evidence is being synthesized.
pillowtalk-Qy commentedon Aug 9, 2026
M5 is closed and RC
hackathon-rc-2026-08-05is immutable at34f64df97c510a82a700c7b18bf0c0e0009a0aa2. M6-01 is automated-QA complete in Draft PR #113 with a fixed 3:00 script; M6-02 was synchronized to <=3:00 and now needs real presenter timing/review evidence before merge and downstream media/submission.