M6-01: Finalize three-minute script, evidence claims and Q&A #61
Dependency state: M5-04 is complete, so the Issue-authorized draft may begin. Final approval and closure remain blocked by Maintainer-only #59 and its exact RC tag.
Evidence sources: merged behavior, Gate A/B/C reports, evidence claims, Known Issues, accepted ADRs, and the public health contract.
Deliverables: fixed <=5 minute primary and fallback scripts, 20+ bounded Q&A entries with evidence links, and an evidence-bounded project description.
Non-goals: no product code, schema, STOP semantics, trust-boundary, Live configuration, media, rehearsal result, tag, or submission claim.
Verification: claim-risk scan, link/path audit, formatting, full pnpm check under Node 22.23.1, exact-head CI, then clean SINGLE_OPERATOR_QA.
Scope is confirmed for a Draft PR only. The PR must remain Draft and must not close #61 until #59 is complete and the final script is reviewed against that immutable RC.
changed the title [-]M6-01: Finalize five-minute script, evidence claims and Q&A[/-][+]M6-01: Finalize three-minute script, evidence claims and Q&A[/+]on Aug 9, 2026
Scope updated to the authorized three-minute M6-01 format. RC dependency is complete at annotated tag hackathon-rc-2026-08-05 peeled to 34f64df97c510a82a700c7b18bf0c0e0009a0aa2. Automated checks remain required; human timing and product/technical/security review remain with M6-02.
Automated M6-01 verification is complete at branch head 89b20ed9e74748f9c6b4b0d330c43a9c0b6d7c39: exact-head CI PASS, clean pnpm check PASS (52 files / 1,264 tests), public smoke 9/9, 157 local links, 30 Q&A entries, and 238 narration words across the fixed 3:00 window. Remaining acceptance is real human timing and product/technical/security review; no such evidence is inferred.
Final exact-head update: e6df9d6dcb9beaf543397ea48e3d40ed2c14166d records the real RC tag/commit in the submission draft and passes local full QA plus exact-head CI run 31306528195. Automated M6-01 work is complete; real three-run timing and three-discipline review remain outstanding.
Activity
pillowtalk-Qy commentedon Aug 9, 2026
SINGLE_OPERATOR_SCOPE_REVIEW / DRAFT IMPLEMENTATION AUTHORIZED
Baseline:
main@4ec4e2d8c5e8fbbc08572f544461cbd5e1c24d7d.Writable scope only:
docs/demo-script.md,docs/judge-qa.md,submission/project-description.md.Dependency state: M5-04 is complete, so the Issue-authorized draft may begin. Final approval and closure remain blocked by Maintainer-only #59 and its exact RC tag.
Evidence sources: merged behavior, Gate A/B/C reports, evidence claims, Known Issues, accepted ADRs, and the public health contract.
Deliverables: fixed <=5 minute primary and fallback scripts, 20+ bounded Q&A entries with evidence links, and an evidence-bounded project description.
Non-goals: no product code, schema, STOP semantics, trust-boundary, Live configuration, media, rehearsal result, tag, or submission claim.
Verification: claim-risk scan, link/path audit, formatting, full
pnpm checkunder Node 22.23.1, exact-head CI, then cleanSINGLE_OPERATOR_QA.Scope is confirmed for a Draft PR only. The PR must remain Draft and must not close #61 until #59 is complete and the final script is reviewed against that immutable RC.
[-]M6-01: Finalize five-minute script, evidence claims and Q&A[/-][+]M6-01: Finalize three-minute script, evidence claims and Q&A[/+]pillowtalk-Qy commentedon Aug 9, 2026
Scope updated to the authorized three-minute M6-01 format. RC dependency is complete at annotated tag
hackathon-rc-2026-08-05peeled to34f64df97c510a82a700c7b18bf0c0e0009a0aa2. Automated checks remain required; human timing and product/technical/security review remain with M6-02.pillowtalk-Qy commentedon Aug 9, 2026
Automated M6-01 verification is complete at branch head
89b20ed9e74748f9c6b4b0d330c43a9c0b6d7c39: exact-head CI PASS, cleanpnpm checkPASS (52 files / 1,264 tests), public smoke 9/9, 157 local links, 30 Q&A entries, and 238 narration words across the fixed 3:00 window. Remaining acceptance is real human timing and product/technical/security review; no such evidence is inferred.pillowtalk-Qy commentedon Aug 9, 2026
Final exact-head update:
e6df9d6dcb9beaf543397ea48e3d40ed2c14166drecords the real RC tag/commit in the submission draft and passes local full QA plus exact-head CI run 31306528195. Automated M6-01 work is complete; real three-run timing and three-discipline review remain outstanding.