Skip to content

M1-04: Add MANUAL_REVIEW success fixture #7

Closed

Description

@pillowtalk-Qy

Fallback owner: Qy

协作与发布:
Implementation may begin immediately.
Merge order is controlled by Qy through the Merge Gate.
If a prerequisite has not merged, keep the PR as Draft or rebase
before final review.

范围:

  • 新增完整且合法的 Success Fixture。
  • 所有关键 Alignment 为 PASS。
  • 最终状态为 MANUAL_REVIEW。

验收:

  • Fixture 能通过 M1-02 Schema。
  • 文件和限制说明清楚标注为开发 Fixture。
  • 不包含真实 Moss、Monad、协议、Token、Quote、gas 或 Receipt 证据。
  • 测试证明 Success Fixture 可解析。
  • 明确写出 MANUAL_REVIEW 不等于安全或可签名。

Activity

  1. pillowtalk-Qy commented on Jul 26, 2026

    @pillowtalk-Qy
    ContributorAuthor

    Maintainer dependency block

    Issue #7 is blocked by Draft PR #15 and its unresolved PreflightReport v0.1 Schema trust-boundary findings. Project Status is Blocked.

    PR #16 must remain Draft and stacked on #15. It must not receive an independent Merge Gate; its current-head quality-gate does not validate a future #15 repair.

  2. added and removed
    status:blockedBlocked by an unresolved dependency
    on Jul 27, 2026
  3. pillowtalk-Qy commented on Jul 27, 2026

    @pillowtalk-Qy
    ContributorAuthor

    Maintainer refresh authorization

    The former upstream blocker, PR #15 not yet merged, is resolved.

    Authorization:

    Issue #7 is now Ready because the refresh work can begin. PR #16 remains Draft / status:blocked / Project Blocked until the refreshed head satisfies every condition above. This is refresh authorization, not Merge Gate authorization.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area:qaQuality assurance and testingpriority:P1High prioritytype:featureNew product functionality

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions