docs(workplan): sync WORKPLAN.md and P3 slices after P5b-2 COMPLETE (#139)#140
Closed
lantisprime wants to merge 1 commit into
Closed
docs(workplan): sync WORKPLAN.md and P3 slices after P5b-2 COMPLETE (#139)#140lantisprime wants to merge 1 commit into
lantisprime wants to merge 1 commit into
Conversation
…139) Co-Authored-By: codex <noreply@openai.com>
lantiscooperdev
approved these changes
Jul 4, 2026
lantiscooperdev
approved these changes
Jul 5, 2026
Owner
Author
|
Closing as superseded. This PR was a workplan-sync after P5b-2 (#139, merged 2026-07-04 10:50 UTC), but 4 newer workplan-sync PRs since then have advanced both
Force-merging this branch would rewind the workplan pointer to the now-superseded episode The P5b-2 sync content this PR carried is already baked into the canonical episode chain. Safe to drop. Independent of #145 (P5F-1 trust reader), which touches different files and remains |
lantiscooperdev
pushed a commit
that referenced
this pull request
Jul 5, 2026
…, 08a9be6) (#146) P5F-1 disk-backed per-project trust reader merged via PR #145 (squash `08a9be6`). Updates the two workplan pointer files to the new canonical episode head `20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3` (supersedes the P5F-plan-accepted head `20260704-141949-...a0b1`). Changes: - WORKPLAN.md — current-state block: P5F-1 COMPLETE (#145, 08a9be6); P5F-2 writer+resolver step-tables (author + plan-review) is next. Chain head, revises, tags, summary all updated to the new episode. Follow-up bullet flipped from "P5F-1 (NEXT)" to "P5F-1 COMPLETE" + new "P5F-2 (NEXT)". - agents/P3_IMPLEMENTATION_SLICES.md — P5F section: P5F-1 marked SHIPPED (with the R1→R2 consensus fix trail + 13/13 tests + INV/REQ evidence), P5F-2 marked NEXT (step-tables deferred by design — now to be authored + plan-reviewed since the reader held up under the 13 P5F-1 tests), P5F-3 deferral note dropped from post-P5F-1-review to post-P5F-2-review. Also documents the closure of stale PR #140 (workplan-sync after P5b-2) which was CONFLICTING/DIRTY and fully superseded by #138/#142/#143/#144. The episodic memory episode is canonical; these markdown files are convenience references synced per project-runbook:workplan-update.md. Co-authored-by: Charlton D. Ho <dev@znp.pw> Co-authored-by: Claude <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Workplan sync after P5b-2 merge
P5b-2 zellij-terminal backend merged via #139 (commit
3c6e6b8). This PR syncs the two pointer files to the new canonical workplan episode.Changes
WORKPLAN.md— current-state block updated: P5b-2 COMPLETE; chain head →20260704-104711-post-merge-sync-p5b-2-zellij-terminal-ba-edce; P5b-3 wezterm / P5b-4 headless /zellij-controlare the next-natural follow-ups.agents/P3_IMPLEMENTATION_SLICES.md— new P5b-2 section added after the P5+ orphan-reaper block: single-slice ladder row (P5b-2, MERGED PR P5b-2: zellij-terminal backend #139,3c6e6b8), two-step launch design, spawn-fix journey, contracts, review trail, stats.Source of truth
The episodic memory episode
20260704-104711-post-merge-sync-p5b-2-zellij-terminal-ba-edce(tagcanonical-workplan) is canonical; these two markdown files are convenience references synced perproject-runbook:workplan-update.md.Co-Authored-By: codex noreply@openai.com