Repository navigation
SMV P3: Inter typography, Ua time-axis, phasor angles, publisher sync and guarded 3-phase power - #714
Conversation
… service with verified-profile gating
…er measurement panel
…d real millisecond tick axis
…nstance formatting helpers
…nstance formatting helpers
…nstance formatting helpers
…nstance formatting helpers
…phasor angle display
✅ P3 exact-SHA Windows acceptance checkpoint — 2026-10-23The final P3 head under test is
Operator FAT candidate: Download ARSAS v1.6.40 portable EXE artifact #12507810691. SHA-256 Engineering acceptance caveats: The sync badge is explicitly the received publisher smpSynch, not local verified GPS/PTP. P/Q1/S/PF only compute for coherent clean 8-channel 9-2LE operator-selected I/U mapping; Q1 is fundamental reactive, P is mean paired u*i, S is true U rms * I rms, PF=P/S. Ua rising crossing is visual t=0 when detected; RAW remains frame-relative. No decoded samples/packet engine/source timestamps were changed. Remaining FAT: User Windows screenshot must confirm readable cursor font at 100/150% DPI, phasor angle labels fit at corners, 5ms/10ms tick readability, correct source publisher sync flags and stream/hold behavior, and power math against actual ARSVIN scenarios. This PR remains DRAFT / NOT MERGED. Shared App.xaml font token overlaps #679 and #686; preserve both sides on deliberate three-way integration; FAT typography overrides touch isolated files but must be reviewed against concurrent work. |
|
Windows FAT correction checkpoint (2026-10-24): Draft PR #715 now stacks directly on the exact P3 #714 HEAD |
|
P0 coordination: Draft #717 stacks atop #715/#714, preserving all already-approved Inter/cursor/sync/timeline/power DSP. New change is strictly presentational UX + retained stream transition and source tests. Parent #714, Write/Control and SG7 workstream branches remain untouched and unmerged; do not advertise #714/#715 physical EXE as P0. |
…integration checkpoint (#725) Consolidates approved SMV PRs #708 #711 #714 #715 #717 #719 #722 without moving main or draft SSOT branch #705. FAT source: 4b2b62f Gate: Windows CI #40052239441 SUCCESS; SV #40052239421 SUCCESS; P1 advisory #40052239471 SUCCESS. Operator-accepted Windows FAT; handoff/checkpoint manifest retained on integration target. Do not treat as main/release integration.
|
Closed as consolidated into the approved SMV FAT integration #725, merged to isolated checkpoint branch This PR's approved commit lineage is preserved by the merge-commit in #725. Exact final tested source |
Purpose
Implement operator-approved P3 in a separate Draft PR stacked directly on P2 #711. Avoid changing concurrent MMS Write/Control, SG7 performance and Smart IP branches.
P3 scope
Validation gates