docs(workplan): post-merge sync — P5F plan ACCEPTED (#143)#144
Merged
Conversation
Canonical workplan episode revised: 20260704-122521-...-d94b -> 20260704-141949-...-a0b1 WORKPLAN.md: chain-head pointer + Current-state line + Open-follow-ups list updated. P5F-1 marked as NEXT. P4R-PROJ + persistent-default- backend now annotated as 'unblocked via P5F (shipping)'. agents/P3_IMPLEMENTATION_SLICES.md: added P5F section with slice ladder (P5F-1 / P5F-2 / P5F-3), 5-round codex review trail, key load-bearing facts (projectTrusted boolean bg-state.ts:55; global MAC at ~/.pi/agent/bg/.session.mac; assertNoSymlink/readUtf8FileNoSymlink PRIVATE so bg-trust.ts inlines local equivalents), cmux process lesson. Planning-only merge; no implementation. P5F-1 ready to slice.
lantiscooperdev
approved these changes
Jul 4, 2026
This was referenced Jul 5, 2026
lantiscooperdev
pushed a commit
that referenced
this pull request
Jul 5, 2026
…, 08a9be6) (#146) P5F-1 disk-backed per-project trust reader merged via PR #145 (squash `08a9be6`). Updates the two workplan pointer files to the new canonical episode head `20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3` (supersedes the P5F-plan-accepted head `20260704-141949-...a0b1`). Changes: - WORKPLAN.md — current-state block: P5F-1 COMPLETE (#145, 08a9be6); P5F-2 writer+resolver step-tables (author + plan-review) is next. Chain head, revises, tags, summary all updated to the new episode. Follow-up bullet flipped from "P5F-1 (NEXT)" to "P5F-1 COMPLETE" + new "P5F-2 (NEXT)". - agents/P3_IMPLEMENTATION_SLICES.md — P5F section: P5F-1 marked SHIPPED (with the R1→R2 consensus fix trail + 13/13 tests + INV/REQ evidence), P5F-2 marked NEXT (step-tables deferred by design — now to be authored + plan-reviewed since the reader held up under the 13 P5F-1 tests), P5F-3 deferral note dropped from post-P5F-1-review to post-P5F-2-review. Also documents the closure of stale PR #140 (workplan-sync after P5b-2) which was CONFLICTING/DIRTY and fully superseded by #138/#142/#143/#144. The episodic memory episode is canonical; these markdown files are convenience references synced per project-runbook:workplan-update.md. Co-authored-by: Charlton D. Ho <dev@znp.pw> Co-authored-by: Claude <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Post-merge workplan sync after PR #143 (P5F plan ACCEPTED via codex 5-pass consensus, merged at
0ca3ee6).Syncs the three workplan sources of truth (per the workplan-update runbook):
20260704-122521-...-d94b→20260704-141949-...-a0b1WORKPLAN.mdpointer + Current-state + Open-follow-ups updated (P5F-1 marked NEXT)agents/P3_IMPLEMENTATION_SLICES.mdP5F section added (slice ladder + review trail + load-bearing facts)No implementation — planning-only merge. P5F-1 (pure reader extraction) is the next slice, ready to be implemented by a high-capability executor (Appendix B step 1.1 has full verbatim
bg-trust.tssource; step 1.2 has 4 verbatim tests + an 8-test contract table).