docs(workplan): post-merge sync — P5F plan ACCEPTED (#143)#144

Merged
lantiscooperdev merged 1 commit into
mainfrom
docs/workplan-sync-p5f-accepted
Jul 4, 2026
Merged

docs(workplan): post-merge sync — P5F plan ACCEPTED (#143)#144
lantiscooperdev merged 1 commit into
mainfrom
docs/workplan-sync-p5f-accepted

Conversation

@lantisprime

Copy link
Copy Markdown
Owner

Post-merge workplan sync after PR #143 (P5F plan ACCEPTED via codex 5-pass consensus, merged at 0ca3ee6).

Syncs the three workplan sources of truth (per the workplan-update runbook):

  • Canonical episodic-memory episode revised: 20260704-122521-...-d94b20260704-141949-...-a0b1
  • WORKPLAN.md pointer + Current-state + Open-follow-ups updated (P5F-1 marked NEXT)
  • agents/P3_IMPLEMENTATION_SLICES.md P5F section added (slice ladder + review trail + load-bearing facts)

No implementation — planning-only merge. P5F-1 (pure reader extraction) is the next slice, ready to be implemented by a high-capability executor (Appendix B step 1.1 has full verbatim bg-trust.ts source; step 1.2 has 4 verbatim tests + an 8-test contract table).

Canonical workplan episode revised:
  20260704-122521-...-d94b -> 20260704-141949-...-a0b1

WORKPLAN.md: chain-head pointer + Current-state line + Open-follow-ups
list updated. P5F-1 marked as NEXT. P4R-PROJ + persistent-default-
backend now annotated as 'unblocked via P5F (shipping)'.

agents/P3_IMPLEMENTATION_SLICES.md: added P5F section with slice ladder
(P5F-1 / P5F-2 / P5F-3), 5-round codex review trail, key load-bearing
facts (projectTrusted boolean bg-state.ts:55; global MAC at
~/.pi/agent/bg/.session.mac; assertNoSymlink/readUtf8FileNoSymlink
PRIVATE so bg-trust.ts inlines local equivalents), cmux process lesson.

Planning-only merge; no implementation. P5F-1 ready to slice.
@lantiscooperdev
lantiscooperdev merged commit 9c9f816 into main Jul 4, 2026
1 check passed
lantiscooperdev pushed a commit that referenced this pull request Jul 5, 2026
…, 08a9be6) (#146)

P5F-1 disk-backed per-project trust reader merged via PR #145 (squash
`08a9be6`). Updates the two workplan pointer files to the new canonical
episode head `20260705-130253-post-merge-sync-p5f-1-trust-reader-compl-a5b3`
(supersedes the P5F-plan-accepted head `20260704-141949-...a0b1`).

Changes:
- WORKPLAN.md — current-state block: P5F-1 COMPLETE (#145, 08a9be6); P5F-2
  writer+resolver step-tables (author + plan-review) is next. Chain head,
  revises, tags, summary all updated to the new episode. Follow-up bullet
  flipped from "P5F-1 (NEXT)" to "P5F-1 COMPLETE" + new "P5F-2 (NEXT)".
- agents/P3_IMPLEMENTATION_SLICES.md — P5F section: P5F-1 marked SHIPPED
  (with the R1→R2 consensus fix trail + 13/13 tests + INV/REQ evidence),
  P5F-2 marked NEXT (step-tables deferred by design — now to be authored
  + plan-reviewed since the reader held up under the 13 P5F-1 tests),
  P5F-3 deferral note dropped from post-P5F-1-review to post-P5F-2-review.

Also documents the closure of stale PR #140 (workplan-sync after P5b-2)
which was CONFLICTING/DIRTY and fully superseded by #138/#142/#143/#144.

The episodic memory episode is canonical; these markdown files are
convenience references synced per project-runbook:workplan-update.md.

Co-authored-by: Charlton D. Ho <dev@znp.pw>
Co-authored-by: Claude <noreply@anthropic.com>
@lantisprime
lantisprime deleted the docs/workplan-sync-p5f-accepted branch July 5, 2026 13:11
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants