Skip to content

LIM-2424 v6: Sean's Low follow-ups (plain wording, record link, dead code) - #11

Merged
allsmog merged 1 commit into
mainfrom
fix/LIM-2424-v6-lows
Oct 23, 2026
Merged

allsmog merged 1 commit into
mainfrom
fix/LIM-2424-v6-lows

Conversation

@liminalshruti

Copy link
Copy Markdown
Collaborator

Sean's Low follow-ups from his #7 review (items 4 to 6). One commit, 6f3f6efce72f09f769af25f96f98ccb4aba78790, stacked on #10: merge #10 first, then retarget this to main.

Changes

ui-northstar re-baseline (needs your sign-off)

Exactly four strings change, in 39 files, and nothing else: "Activity", "Clashes with the CEO's new requirement", "Requirement changed today", and the "Coming next" line.

Left for a founder or Sean call

  • P0/P1/P2 in the brief
  • raw plan ids on the Studio cards
  • raw state chips in the thread ("ratified", "acknowledged")
  • scripts/run-plan.sh lines on the test-results screen
  • removing the unreachable pre-agreement branches of DecisionView and TodayView

Gate

scripts/test-all.sh 3247: all 15 steps pass (ui-loop 34/34, tenancy 166/166, scenario 73/73 ×3, ui-northstar 125 files identical to the new baseline).

https://claude.ai/code/session_01JTqypyDqMz25L5fgdzcRWF

@allsmog allsmog left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Approved @ 6f3f6ef. Read the diff. This covers my Lows: "Clashes with the CEO's new requirement" and "Requirement changed" replace KR2, Northstar's Open record goes to the record, the tab is Activity and no longer Receipts, the activity wording is current (including declined and launch actions), there's plain copy on the not-built card, and unused WorkScreen is removed. The snapshot changes match these copy edits. Gate: I'll run it on main after the merges.

…code)

From Sean's #7 review (items 4 to 6) and the review in comment 6356535154:

- Record: the "Receipts" tab is now "Activity". The results aren't signed
  (EvidenceView says so), so "Receipts" overclaimed.
- Goals (Northstar): "Clashes with KR2" is back to "Clashes with the CEO's
  new requirement", and "KR2 changed today" is "Requirement changed today",
  as in custom scenarios.
- Goals (Northstar): "Open record" opens the decision record, not the old
  Evidence screen.
- Record audit and touchpoint wording: "read Ways forward", "opened the test
  results", plus plain words for the actions the server writes
  (ratify_untested, reject, launch_approved, launch_not_yet). The dead
  "launch" key is removed.
- Work: "Needs a decision field on work items. Not built yet." is now user
  copy ("Coming next: ..."), and the unused WorkScreen export is gone.

Northstar UI baseline re-captured: exactly those four strings change
(Activity, Clashes with the CEO's new requirement, Requirement changed today,
the Coming next line), in 39 files. Nothing else.

Left for a founder or Sean call (wording or design): P0/P1/P2 in the brief,
raw plan ids on the Studio cards, raw state chips in the thread,
scripts/run-plan.sh lines on the test-results screen, and removing the
unreachable pre-agreement branches of DecisionView and TodayView.

Gate: scripts/test-all.sh 3247, all 15 steps pass (ui-loop 34/34, tenancy
166/166, scenario 73/73 x3, ui-northstar 125 files identical to the new
baseline).
@allsmog
allsmog changed the base branch from fix/LIM-2424-v6-followups to main October 23, 2026 16:21
@allsmog
allsmog force-pushed the fix/LIM-2424-v6-lows branch from 6f3f6ef to 832254d Compare October 23, 2026 16:21
@allsmog
allsmog merged commit b21ff7c into main Oct 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants